Letting of 1/26/2005 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 455-04-0018
Parish: AVOYELLES, RAPIDES, EVANGELINE
Routes: I-49
Description: I-49 OVERLAY, JCT. LA 106 - JCT. LA 181
Type Const: grading, cold planing asphaltic concrete, pavement patching, suprepave asphaltic
concrete overlay, and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $5,431,441.73
212312 GILCHRIST CONSTRUCTION CO. LLC $5,591,929.27
328665 GILBERT SOUTHERN CORP $6,651,218.06
405789 D & J CONSTRUCTION CO., INC. $6,883,230.04
504089 H & S CONSTRUCTION CO., INC. $9,870,243.23
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
GILBERT SOUTHERN CORP
- 4 -
D & J CONSTRUCTION CO., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 5,500      LNFT 3.12 17,160.00 3.50 19,250.00 3.15 17,325.00 8.50 46,750.00
203-08 borrow (vehicular measurement) 14,854      CUYD 8.30 123,288.20 10.00 148,540.00 10.00 148,540.00 10.00 148,540.00
502-01 superpave asphaltic concrete 102,113.8    TON 39.34 4,017,156.89 38.00 3,880,324.40 46.00 4,697,234.80 47.50 4,850,405.50
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,995.0    TON 63.57 126,822.15 60.00 119,700.00 70.00 139,650.00 65.00 129,675.00
509-01 cold planing asphaltic pavement 444,756      SQYD 0.75 333,567.00 1.00 444,756.00 0.70 311,329.20 1.35 600,420.60
509-02 contractor retained reclaimed asphaltic pavement - 12,354      CUYD 0.10 - 1,235.40 1.00 - 12,354.00 0.01 - 123.54 0.01 - 123.54
602-02-A cleaning and resealing existing longitudinal pavement
joints
200      LNFT 4.00 800.00 6.00 1,200.00 2.00 400.00 10.00 2,000.00
602-02-B cleaning and resealing existing transverse pavement
joints
300      LNFT 4.00 1,200.00 6.00 1,800.00 2.00 600.00 10.00 3,000.00
602-03 cleaning and sealing random cracks 100      LNFT 5.00 500.00 6.00 600.00 3.00 300.00 10.00 1,000.00
704-03 blocked out guard rail 4,188.0    LNFT 17.00 71,196.00 16.50 69,102.00 16.25 68,055.00 16.00 67,008.00
704-07-A guard rail bridge attachments (single thrie beam) 250.0    LNFT 35.00 8,750.00 35.00 8,750.00 36.00 9,000.00 30.00 7,500.00
704-08-B guard rail transitions (double thrie beam) 500.0    LNFT 42.00 21,000.00 42.00 21,000.00 42.00 21,000.00 40.00 20,000.00
704-11-A guard rail end treatment (flared) 20      EACH 1,900.00 38,000.00 1,850.00 37,000.00 1,900.00 38,000.00 1,850.00 37,000.00
713-01 temporary signs & barricades lump      LUMP 225,000.00 225,000.00 140,000.00 140,000.00 200,000.00 200,000.00 218,000.00 218,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
57.271  MILE 10.00 572.71 450.00 25,771.95 0.01 0.57 165.00 9,449.71
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
57.271  MILE 10.00 572.71 225.00 12,885.97 0.01 0.57 1.00 57.27
713-05-A temporary pavement markings (solid line)(4" width) 119.280  MILE 100.00 11,928.00 450.00 53,676.00 0.01 1.19 1.00 119.28
724-01-C pavement patching (21" minimum thickness) 200      SQYD 126.00 25,200.00 200.00 40,000.00 150.00 30,000.00 250.00 50,000.00
727-01 mobilization lump      LUMP 100,000.00 100,000.00 200,000.00 200,000.00 634,666.00 634,666.00 350,000.00 350,000.00
729-16-C object marker assembly (type 3) 20      EACH 70.00 1,400.00 70.00 1,400.00 70.00 1,400.00 70.00 1,400.00
731-02 reflectorized raised pavement markers 3,785      EACH 5.00 18,925.00 5.00 18,925.00 5.00 18,925.00 4.65 17,600.25
732-01-C plastic pavement striping (8" width) 5,648      LNFT 0.83 4,687.84 1.00 5,648.00 0.85 4,800.80 1.55 8,754.40
732-02-A plastic pavement striping (solid line) (4" width) 41.520  MILE 1,900.00 78,888.00 1,850.00 76,812.00 1,900.00 78,888.00 2,265.00 94,042.80
732-03-A plastic pavement striping (broken line)(4" width) 20.559  MILE 570.00 11,718.63 550.00 11,307.45 0.85 17.47 925.00 19,017.07
739-01 hydro-seeding 28.84   ACRE 850.00 24,514.00 825.00 23,793.00 900.00 25,956.00 800.00 23,072.00
740-01 construction layout lump      LUMP 9,000.00 9,000.00 40,000.00 40,000.00 20,000.00 20,000.00 20,000.00 20,000.00
S-001 raising and/or undersealing concrete slabs
(polyurethane)
18,322      LB 4.50 82,449.00 5.75 105,351.50 6.00 109,932.00 4.85 88,861.70
S-002 catch basin apron 26      EACH 1,300.00 33,800.00 600.00 15,600.00 400.00 10,400.00 1,000.00 26,000.00
S-003 sack concrete headwall 15.0    CUYD 525.00 7,875.00 350.00 5,250.00 600.00 9,000.00 650.00 9,750.00
S-004 rumble strips (ground-in) 39.8    MILE 470.00 18,706.00 800.00 31,840.00 400.00 15,920.00 350.00 13,930.00
S-005 variable message sign unit 4      EACH 4,500.00 18,000.00 11,000.00 44,000.00 10,000.00 40,000.00 5,000.00 20,000.00
                       
 CONTRACTOR TOTAL       5,431,441.73   5,591,929.27   6,651,218.06   6,883,230.04
 
Item Number Item Description Quantity Unit of Measure - 5 -
H & S CONSTRUCTION CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 5,500      LNFT 5.00 27,500.00            
203-08 borrow (vehicular measurement) 14,854      CUYD 14.00 207,956.00            
502-01 superpave asphaltic concrete 102,113.8    TON 64.00 6,535,283.20            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
1,995.0    TON 70.00 139,650.00            
509-01 cold planing asphaltic pavement 444,756      SQYD 1.50 667,134.00            
509-02 contractor retained reclaimed asphaltic pavement - 12,354      CUYD 0.05 - 617.70            
602-02-A cleaning and resealing existing longitudinal pavement
joints
200      LNFT 3.75 750.00            
602-02-B cleaning and resealing existing transverse pavement
joints
300      LNFT 3.75 1,125.00            
602-03 cleaning and sealing random cracks 100      LNFT 5.25 525.00            
704-03 blocked out guard rail 4,188.0    LNFT 19.20 80,409.60            
704-07-A guard rail bridge attachments (single thrie beam) 250.0    LNFT 36.00 9,000.00            
704-08-B guard rail transitions (double thrie beam) 500.0    LNFT 48.00 24,000.00            
704-11-A guard rail end treatment (flared) 20      EACH 2,200.00 44,000.00            
713-01 temporary signs & barricades lump      LUMP 350,000.00 350,000.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
57.271  MILE 350.00 20,044.85            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
57.271  MILE 243.00 13,916.85            
713-05-A temporary pavement markings (solid line)(4" width) 119.280  MILE 485.00 57,850.80            
724-01-C pavement patching (21" minimum thickness) 200      SQYD 160.00 32,000.00            
727-01 mobilization lump      LUMP 1,000,000.00 1,000,000.00            
729-16-C object marker assembly (type 3) 20      EACH 84.00 1,680.00            
731-02 reflectorized raised pavement markers 3,785      EACH 5.50 20,817.50            
732-01-C plastic pavement striping (8" width) 5,648      LNFT 0.95 5,365.60            
732-02-A plastic pavement striping (solid line) (4" width) 41.520  MILE 2,100.00 87,192.00            
732-03-A plastic pavement striping (broken line)(4" width) 20.559  MILE 621.00 12,767.13            
739-01 hydro-seeding 28.84   ACRE 2,000.00 57,680.00            
740-01 construction layout lump      LUMP 120,000.00 120,000.00            
S-001 raising and/or undersealing concrete slabs
(polyurethane)
18,322      LB 10.00 183,220.00            
S-002 catch basin apron 26      EACH 1,800.00 46,800.00            
S-003 sack concrete headwall 15.0    CUYD 200.00 3,000.00            
S-004 rumble strips (ground-in) 39.8    MILE 633.00 25,193.40            
S-005 variable message sign unit 4      EACH 24,000.00 96,000.00            
                       
 CONTRACTOR TOTAL       9,870,243.23