| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - GILBERT SOUTHERN CORP |
- 4 - D & J CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
5,500   |
LNFT |
3.12 |
17,160.00 |
3.50 |
19,250.00 |
3.15 |
17,325.00 |
8.50 |
46,750.00 |
| 203-08 |
borrow (vehicular measurement)
|
14,854   |
CUYD |
8.30 |
123,288.20 |
10.00 |
148,540.00 |
10.00 |
148,540.00 |
10.00 |
148,540.00 |
| 502-01 |
superpave asphaltic concrete
|
102,113.8 |
TON |
39.34 |
4,017,156.89 |
38.00 |
3,880,324.40 |
46.00 |
4,697,234.80 |
47.50 |
4,850,405.50 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,995.0 |
TON |
63.57 |
126,822.15 |
60.00 |
119,700.00 |
70.00 |
139,650.00 |
65.00 |
129,675.00 |
| 509-01 |
cold planing asphaltic pavement
|
444,756   |
SQYD |
0.75 |
333,567.00 |
1.00 |
444,756.00 |
0.70 |
311,329.20 |
1.35 |
600,420.60 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 12,354   |
CUYD |
0.10 |
- 1,235.40 |
1.00 |
- 12,354.00 |
0.01 |
- 123.54 |
0.01 |
- 123.54 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
200   |
LNFT |
4.00 |
800.00 |
6.00 |
1,200.00 |
2.00 |
400.00 |
10.00 |
2,000.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
300   |
LNFT |
4.00 |
1,200.00 |
6.00 |
1,800.00 |
2.00 |
600.00 |
10.00 |
3,000.00 |
| 602-03 |
cleaning and sealing random cracks
|
100   |
LNFT |
5.00 |
500.00 |
6.00 |
600.00 |
3.00 |
300.00 |
10.00 |
1,000.00 |
| 704-03 |
blocked out guard rail
|
4,188.0 |
LNFT |
17.00 |
71,196.00 |
16.50 |
69,102.00 |
16.25 |
68,055.00 |
16.00 |
67,008.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
250.0 |
LNFT |
35.00 |
8,750.00 |
35.00 |
8,750.00 |
36.00 |
9,000.00 |
30.00 |
7,500.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
500.0 |
LNFT |
42.00 |
21,000.00 |
42.00 |
21,000.00 |
42.00 |
21,000.00 |
40.00 |
20,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
20   |
EACH |
1,900.00 |
38,000.00 |
1,850.00 |
37,000.00 |
1,900.00 |
38,000.00 |
1,850.00 |
37,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
225,000.00 |
225,000.00 |
140,000.00 |
140,000.00 |
200,000.00 |
200,000.00 |
218,000.00 |
218,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
57.271 |
MILE |
10.00 |
572.71 |
450.00 |
25,771.95 |
0.01 |
0.57 |
165.00 |
9,449.71 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
57.271 |
MILE |
10.00 |
572.71 |
225.00 |
12,885.97 |
0.01 |
0.57 |
1.00 |
57.27 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
119.280 |
MILE |
100.00 |
11,928.00 |
450.00 |
53,676.00 |
0.01 |
1.19 |
1.00 |
119.28 |
| 724-01-C |
pavement patching (21" minimum thickness)
|
200   |
SQYD |
126.00 |
25,200.00 |
200.00 |
40,000.00 |
150.00 |
30,000.00 |
250.00 |
50,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
200,000.00 |
200,000.00 |
634,666.00 |
634,666.00 |
350,000.00 |
350,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
70.00 |
1,400.00 |
70.00 |
1,400.00 |
70.00 |
1,400.00 |
70.00 |
1,400.00 |
| 731-02 |
reflectorized raised pavement markers
|
3,785   |
EACH |
5.00 |
18,925.00 |
5.00 |
18,925.00 |
5.00 |
18,925.00 |
4.65 |
17,600.25 |
| 732-01-C |
plastic pavement striping (8" width)
|
5,648   |
LNFT |
0.83 |
4,687.84 |
1.00 |
5,648.00 |
0.85 |
4,800.80 |
1.55 |
8,754.40 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
41.520 |
MILE |
1,900.00 |
78,888.00 |
1,850.00 |
76,812.00 |
1,900.00 |
78,888.00 |
2,265.00 |
94,042.80 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
20.559 |
MILE |
570.00 |
11,718.63 |
550.00 |
11,307.45 |
0.85 |
17.47 |
925.00 |
19,017.07 |
| 739-01 |
hydro-seeding
|
28.84 |
ACRE |
850.00 |
24,514.00 |
825.00 |
23,793.00 |
900.00 |
25,956.00 |
800.00 |
23,072.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
9,000.00 |
9,000.00 |
40,000.00 |
40,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
| S-001 |
raising and/or undersealing concrete slabs
(polyurethane) |
18,322   |
LB |
4.50 |
82,449.00 |
5.75 |
105,351.50 |
6.00 |
109,932.00 |
4.85 |
88,861.70 |
| S-002 |
catch basin apron
|
26   |
EACH |
1,300.00 |
33,800.00 |
600.00 |
15,600.00 |
400.00 |
10,400.00 |
1,000.00 |
26,000.00 |
| S-003 |
sack concrete headwall
|
15.0 |
CUYD |
525.00 |
7,875.00 |
350.00 |
5,250.00 |
600.00 |
9,000.00 |
650.00 |
9,750.00 |
| S-004 |
rumble strips (ground-in)
|
39.8 |
MILE |
470.00 |
18,706.00 |
800.00 |
31,840.00 |
400.00 |
15,920.00 |
350.00 |
13,930.00 |
| S-005 |
variable message sign unit
|
4   |
EACH |
4,500.00 |
18,000.00 |
11,000.00 |
44,000.00 |
10,000.00 |
40,000.00 |
5,000.00 |
20,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,431,441.73 |
|
5,591,929.27 |
|
6,651,218.06 |
|
6,883,230.04 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - H & S CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
5,500   |
LNFT |
5.00 |
27,500.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
14,854   |
CUYD |
14.00 |
207,956.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
102,113.8 |
TON |
64.00 |
6,535,283.20 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,995.0 |
TON |
70.00 |
139,650.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
444,756   |
SQYD |
1.50 |
667,134.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 12,354   |
CUYD |
0.05 |
- 617.70 |
|
|
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
200   |
LNFT |
3.75 |
750.00 |
|
|
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
300   |
LNFT |
3.75 |
1,125.00 |
|
|
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
100   |
LNFT |
5.25 |
525.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
4,188.0 |
LNFT |
19.20 |
80,409.60 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
250.0 |
LNFT |
36.00 |
9,000.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
500.0 |
LNFT |
48.00 |
24,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
20   |
EACH |
2,200.00 |
44,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
350,000.00 |
350,000.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
57.271 |
MILE |
350.00 |
20,044.85 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
57.271 |
MILE |
243.00 |
13,916.85 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
119.280 |
MILE |
485.00 |
57,850.80 |
|
|
|
|
|
|
| 724-01-C |
pavement patching (21" minimum thickness)
|
200   |
SQYD |
160.00 |
32,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
84.00 |
1,680.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,785   |
EACH |
5.50 |
20,817.50 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
5,648   |
LNFT |
0.95 |
5,365.60 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
41.520 |
MILE |
2,100.00 |
87,192.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
20.559 |
MILE |
621.00 |
12,767.13 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
28.84 |
ACRE |
2,000.00 |
57,680.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
120,000.00 |
120,000.00 |
|
|
|
|
|
|
| S-001 |
raising and/or undersealing concrete slabs
(polyurethane) |
18,322   |
LB |
10.00 |
183,220.00 |
|
|
|
|
|
|
| S-002 |
catch basin apron
|
26   |
EACH |
1,800.00 |
46,800.00 |
|
|
|
|
|
|
| S-003 |
sack concrete headwall
|
15.0 |
CUYD |
200.00 |
3,000.00 |
|
|
|
|
|
|
| S-004 |
rumble strips (ground-in)
|
39.8 |
MILE |
633.00 |
25,193.40 |
|
|
|
|
|
|
| S-005 |
variable message sign unit
|
4   |
EACH |
24,000.00 |
96,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
9,870,243.23 |
|
|
|
|
|
|
|