Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 834-13-0008
Parish: MOREHOUSE
Routes: LA 830-4
Description: U.S. 165 - LA 830-3
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete pavement and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $588,815.13
205789 D & J CONSTRUCTION CO., INC. $678,555.99
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,500.00 5,500.00 1,000.00 1,000.00        
202-02-D removal of concrete walks & drives 1,006      SQYD 11.00 11,066.00 5.00 5,030.00        
203-08 borrow (vehicular measurement) 200      CUYD 16.50 3,300.00 40.00 8,000.00        
203-08-A borrow (vehicular meas.)(selected soils) 103      CUYD 17.00 1,751.00 10.00 1,030.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
91      CUYD 33.00 3,003.00 75.00 6,825.00        
402-01 traffic maintenance aggregate (vehicular measurement) 300.0    CUYD 55.64 16,692.00 15.00 4,500.00        
502-01-A superpave asphaltic concrete (level 1) 4,216.8    TON 52.99 223,448.23 52.00 219,273.60        
502-01-D superpave asphaltic concrete, incidental paving (level
a)
283.7    TON 141.20 40,058.44 100.00 28,370.00        
509-01 cold planing asphaltic pavement 20,477      SQYD 1.53 31,329.81 3.00 61,431.00        
509-02 contractor retained reclaimed asphaltic pavement - 966      CUYD 0.15 - 144.90 0.01 - 9.66        
602-02-A cleaning and resealing existing longitudinal pavement
joints
2,320      LNFT 1.21 2,807.20 2.00 4,640.00        
602-02-B cleaning and resealing existing transverse pavement
joints
1,392      LNFT 1.27 1,767.84 2.50 3,480.00        
701-05-I side drain pipe (24") 84      LNFT 55.00 4,620.00 74.00 6,216.00        
701-10-I reinforced concrete pipe (extension)(24") 32      LNFT 82.50 2,640.00 148.00 4,736.00        
701-15 concrete collar 8      EACH 330.00 2,640.00 600.00 4,800.00        
706-02-C concrete drive (6" thick) 872.2    SQYD 44.00 38,376.80 54.00 47,098.80        
713-01 temporary signs & barricades lump      LUMP 3,900.00 3,900.00 23,000.00 23,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
3.096  MILE 275.00 851.40 180.00 557.28        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.284  MILE 220.00 282.48 475.00 609.90        
713-05-A temporary pavement markings (solid line)(4" width) 11.164  MILE 440.00 4,912.16 400.00 4,465.60        
713-06-A temporary pavement legends and symbols (arrow) 8      EACH 55.00 440.00 140.00 1,120.00        
713-06-C temporary pavement legends and symbols (only) 8      EACH 55.00 440.00 140.00 1,120.00        
714-02 water 20.9    MGAL 0.03 0.62 1.00 20.90        
716-01-A mulch (vegetative) 2.09   ACRE 687.50 1,436.87 1,000.00 2,090.00        
717-01 seeding 94      LB 7.15 672.10 10.00 940.00        
718-01 fertilizer 2,090      LB 0.24 501.60 0.35 731.50        
722-02 project site laboratory (equipped) 1      EACH 3,500.00 3,500.00 10,000.00 10,000.00        
726-01 bedding material 55.9    CUYD 55.00 3,074.50 65.00 3,633.50        
727-01 mobilization lump      LUMP 32,300.00 32,300.00 50,000.00 50,000.00        
731-02 reflectorized raised pavement markers 388      EACH 4.95 1,920.60 6.50 2,522.00        
732-01-E plastic pavement striping (24" width) 30      LNFT 3.30 99.00 10.00 300.00        
732-02-A plastic pavement striping (solid line) (4" width) 5.582  MILE 1,850.00 10,326.70 2,935.00 16,383.17        
732-03-A plastic pavement striping (broken line)(4" width) 0.642  MILE 660.00 423.72 1,900.00 1,219.80        
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 165.00 660.00 350.00 1,400.00        
732-04-C plastic pavement legends & symbols (only) 4      EACH 165.00 660.00 500.00 2,000.00        
735-01 mailboxes 54      EACH 14.00 756.00 1.00 54.00        
735-02 mailbox supports (single) 48      EACH 156.00 7,488.00 118.00 5,664.00        
735-03 mailbox supports (double) 1      EACH 517.00 517.00 170.00 170.00        
735-04 mailbox supports (multiple) 1      EACH 587.00 587.00 325.00 325.00        
740-01 construction layout lump      LUMP 7,600.00 7,600.00 5,000.00 5,000.00        
S-001 cement treated base course (12 in depth) 20,404      SQYD 5.25 107,121.00 6.15 125,484.60        
S-002 relocating existing ditches 90      LNFT 11.00 990.00 10.00 900.00        
S-003 sawing and sealing longitudinal joints in asphaltic
concrete overlay
2,320      LNFT 1.65 3,828.00 2.00 4,640.00        
S-004 sawing and sealing transverse joints in asphaltic
concrete overlay
1,392      LNFT 1.38 1,920.96 2.00 2,784.00        
S-005 tree removal lump      LUMP 2,750.00 2,750.00 5,000.00 5,000.00        
                       
 CONTRACTOR TOTAL       588,815.13   678,555.99