| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PETERS CONSTRUCTION CO., INC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - C,W & W CONTRACTORS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
9,000.00 |
9,000.00 |
6,000.00 |
6,000.00 |
21,000.00 |
21,000.00 |
28,000.00 |
28,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 19+98.12 - 20.46'w.x 109.81'l.
steel bridge) |
1   |
EACH |
9,000.00 |
9,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
38,500.00 |
38,500.00 |
38,000.00 |
38,000.00 |
20,000.00 |
20,000.00 |
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
10.00 |
280.00 |
10.00 |
280.00 |
8.00 |
224.00 |
10.00 |
280.00 |
| 204-03 |
temporary slope drains
|
160   |
LNFT |
1.00 |
160.00 |
10.00 |
1,600.00 |
10.00 |
1,600.00 |
10.00 |
1,600.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
50.00 |
300.00 |
100.00 |
600.00 |
105.00 |
630.00 |
125.00 |
750.00 |
| 204-06 |
temporary silt fencing
|
1,639   |
LNFT |
1.00 |
1,639.00 |
2.00 |
3,278.00 |
1.00 |
1,639.00 |
1.00 |
1,639.00 |
| 302-01-A |
class ii base course(stone or asphalt)
|
244.4 |
CUYD |
60.00 |
14,664.00 |
80.00 |
19,552.00 |
60.00 |
14,664.00 |
60.00 |
14,664.00 |
| 502-01-A |
superpave asphaltic concrete (level 1)
|
246.2 |
TON |
150.00 |
36,930.00 |
145.00 |
35,699.00 |
103.00 |
25,358.60 |
110.00 |
27,082.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
45.00 |
4,500.00 |
40.00 |
4,000.00 |
55.00 |
5,500.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
30.00 |
3,000.00 |
30.00 |
3,000.00 |
25.00 |
2,500.00 |
35.00 |
3,500.00 |
| 711-01-D |
riprap (55 lb,18" thick)
|
457   |
SQYD |
65.00 |
29,705.00 |
45.00 |
20,565.00 |
35.00 |
15,995.00 |
30.00 |
13,710.00 |
| 711-04 |
geotextile fabric
|
457   |
SQYD |
3.00 |
1,371.00 |
5.00 |
2,285.00 |
2.00 |
914.00 |
2.00 |
914.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
3,450   |
SQYD |
3.25 |
11,212.50 |
1.50 |
5,175.00 |
1.15 |
3,967.50 |
1.50 |
5,175.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
10,000.00 |
10,000.00 |
40,000.00 |
40,000.00 |
44,000.00 |
44,000.00 |
40,000.00 |
40,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
85.00 |
680.00 |
85.00 |
680.00 |
65.00 |
520.00 |
100.00 |
800.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
6,500.00 |
6,500.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
| 804-01-C |
precast concrete piles (16")
|
1,752   |
LNFT |
53.56 |
93,837.12 |
37.00 |
64,824.00 |
60.00 |
105,120.00 |
50.00 |
87,600.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
500.00 |
500.00 |
500.00 |
500.00 |
| 805-10-A |
bridge superstructure & substructure(24'
rdwy.,90 degree crossing) (precast span, cip bents) |
7   |
SPAN |
18,000.00 |
126,000.00 |
18,500.00 |
129,500.00 |
15,500.00 |
108,500.00 |
20,000.00 |
140,000.00 |
| S-101 |
concrete approach slabs (24' rdwy. 90 degree xing)
(w/out asphalt) |
2   |
EACH |
6,200.00 |
12,400.00 |
7,500.00 |
15,000.00 |
6,000.00 |
12,000.00 |
6,000.00 |
12,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
416,678.62 |
|
420,539.00 |
|
421,132.10 |
|
438,714.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - KOSTMAYER CONSTRUCTION, LLC |
- 6 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta. 19+98.12 - 20.46'w.x 109.81'l.
steel bridge) |
1   |
EACH |
35,000.00 |
35,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
43,000.00 |
43,000.00 |
39,000.00 |
39,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
10.00 |
280.00 |
20.00 |
560.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
160   |
LNFT |
5.00 |
800.00 |
17.00 |
2,720.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
100.00 |
600.00 |
148.00 |
888.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,639   |
LNFT |
2.00 |
3,278.00 |
2.00 |
3,278.00 |
|
|
|
|
| 302-01-A |
class ii base course(stone or asphalt)
|
244.4 |
CUYD |
82.00 |
20,040.80 |
55.00 |
13,442.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (level 1)
|
246.2 |
TON |
180.00 |
44,316.00 |
90.00 |
22,158.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
40.00 |
4,000.00 |
42.00 |
4,200.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
30.00 |
3,000.00 |
27.00 |
2,700.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb,18" thick)
|
457   |
SQYD |
65.00 |
29,705.00 |
63.00 |
28,791.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
457   |
SQYD |
5.00 |
2,285.00 |
3.25 |
1,485.25 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,000.00 |
9,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
3,450   |
SQYD |
1.60 |
5,520.00 |
1.70 |
5,865.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
46,000.00 |
46,000.00 |
48,000.00 |
48,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
70.00 |
560.00 |
70.00 |
560.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
11,000.00 |
11,000.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
1,752   |
LNFT |
42.00 |
73,584.00 |
40.00 |
70,080.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
10,500.00 |
10,500.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(24'
rdwy.,90 degree crossing) (precast span, cip bents) |
7   |
SPAN |
17,500.00 |
122,500.00 |
23,000.00 |
161,000.00 |
|
|
|
|
| S-101 |
concrete approach slabs (24' rdwy. 90 degree xing)
(w/out asphalt) |
2   |
EACH |
6,500.00 |
13,000.00 |
4,000.00 |
8,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
476,469.80 |
|
515,227.25 |
|
|
|
|
|