| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - BENTON & BROWN, LLC. |
- 3 - GILBERT SOUTHERN CORP |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
1,000.00 |
1,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
25,002   |
sq m |
7.79 |
194,765.58 |
8.00 |
200,016.00 |
10.00 |
250,020.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
902.8 |
ln m |
6.56 |
5,922.36 |
17.00 |
15,347.60 |
10.00 |
9,028.00 |
|
|
| 202-02-H |
removal of guard rail
|
864   |
ln m |
9.85 |
8,510.40 |
10.00 |
8,640.00 |
7.50 |
6,480.00 |
|
|
| 202-02-I |
removal of surfacing and base
|
11,155   |
sq m |
3.59 |
40,046.45 |
4.00 |
44,620.00 |
4.50 |
50,197.50 |
|
|
| 202-02-K |
removal of reinforced concrete pipe headwall
|
9   |
each |
100.00 |
900.00 |
600.00 |
5,400.00 |
500.00 |
4,500.00 |
|
|
| 202-02-L |
removal of incidential concrete pavement
|
1,174   |
sq m |
5.98 |
7,020.52 |
7.00 |
8,218.00 |
2.00 |
2,348.00 |
|
|
| 202-02-M |
removal of existing sign
|
127   |
ea |
76.40 |
9,702.80 |
110.00 |
13,970.00 |
105.00 |
13,335.00 |
|
|
| 202-02-N |
removal of existing sign supports
|
80   |
ea |
110.00 |
8,800.00 |
220.00 |
17,600.00 |
215.00 |
17,200.00 |
|
|
| 202-02-O |
removal of existing sign and u-channel post
|
24   |
ea |
40.00 |
960.00 |
75.00 |
1,800.00 |
70.00 |
1,680.00 |
|
|
| 203-01 |
general excavation
|
10,403   |
cu m |
0.10 |
1,040.30 |
8.00 |
83,224.00 |
12.00 |
124,836.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
19,800   |
cu m |
8.35 |
165,330.00 |
14.00 |
277,200.00 |
18.25 |
361,350.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
2,200   |
ea |
5.00 |
11,000.00 |
4.00 |
8,800.00 |
8.00 |
17,600.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
165   |
ea |
50.00 |
8,250.00 |
55.00 |
9,075.00 |
125.00 |
20,625.00 |
|
|
| 302-02-C-01 |
class ii base course (250 mm thick) (stone or recycled
pccp) |
11,155.2 |
sq m |
15.85 |
176,809.92 |
15.00 |
167,328.00 |
22.00 |
245,414.40 |
|
|
| 304-01 |
lime
|
172.56 |
Mg |
110.00 |
18,981.60 |
125.00 |
21,570.00 |
101.00 |
17,428.56 |
|
|
| 304-04-D |
lime treatment (type d)(300 mm thick)
|
11,155   |
sq m |
1.80 |
20,079.00 |
4.00 |
44,620.00 |
3.00 |
33,465.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
145,069.2 |
Mg |
48.00 |
6,963,321.60 |
52.00 |
7,543,598.40 |
59.60 |
8,646,124.32 |
|
|
| 502-01-D |
superpave asphaltic concrete incidental paving (level
a) |
480.1 |
Mg |
65.85 |
31,614.58 |
52.00 |
24,965.20 |
100.00 |
48,010.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
64,154   |
sq m |
0.86 |
55,172.44 |
1.75 |
112,269.50 |
2.00 |
128,308.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,199   |
cu m |
0.01 |
- 31.99 |
1.00 |
- 3,199.00 |
0.01 |
- 31.99 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
590   |
ln m |
4.92 |
2,902.80 |
5.50 |
3,245.00 |
3.80 |
2,242.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
1,182   |
ln m |
4.92 |
5,815.44 |
5.50 |
6,501.00 |
4.00 |
4,728.00 |
|
|
| 602-03 |
cleaning and sealing random cracks
|
752   |
ln m |
9.84 |
7,399.68 |
11.00 |
8,272.00 |
8.50 |
6,392.00 |
|
|
| 602-05-I-01 |
full depth patching of jointed concrete pavement
(225 mm thick)(15.0 sq m and under) |
48.0 |
sq m |
130.00 |
6,240.00 |
145.00 |
6,960.00 |
175.00 |
8,400.00 |
|
|
| 602-05-I-02 |
full depth patching of jointed concrete pavement
(225 mm thick)(15.1 sq m to 40.0 sq m) |
69.6 |
sq m |
120.00 |
8,352.00 |
130.00 |
9,048.00 |
150.00 |
10,440.00 |
|
|
| 602-05-I-03 |
full depth patching of jointed concrete pavement
(225 mm thick)(40.1 sq m and over) |
3,332.4 |
sq m |
95.00 |
316,578.00 |
100.00 |
333,240.00 |
150.00 |
499,860.00 |
|
|
| 702-05-A |
cross drain end treatment (type 1)
|
9   |
ea |
450.00 |
4,050.00 |
1,200.00 |
10,800.00 |
1,000.00 |
9,000.00 |
|
|
| 703-01 |
shoulder underdrain systems
|
21,573   |
ln m |
12.85 |
277,213.05 |
34.00 |
733,482.00 |
21.00 |
453,033.00 |
|
|
| 703-02 |
shoulder outlet underdrains
|
162   |
ea |
275.00 |
44,550.00 |
440.00 |
71,280.00 |
400.00 |
64,800.00 |
|
|
| 704-03 |
blocked out guard rail
|
831.12 |
ln m |
40.60 |
33,743.47 |
55.00 |
45,711.60 |
45.00 |
37,400.40 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
121.92 |
ln m |
117.50 |
14,325.60 |
165.00 |
20,116.80 |
130.00 |
15,849.60 |
|
|
| 704-10 |
guard rail anchor block
|
16   |
ea |
675.00 |
10,800.00 |
1,200.00 |
19,200.00 |
735.00 |
11,760.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
16   |
ea |
1,475.00 |
23,600.00 |
1,500.00 |
24,000.00 |
1,600.00 |
25,600.00 |
|
|
| 706-03-C |
incidental concrete paving (150 mm thick)
|
403.4 |
sq m |
52.50 |
21,178.50 |
45.00 |
18,153.00 |
100.00 |
40,340.00 |
|
|
| 711-01-C |
riprap (15 kg,360 mm thick)
|
80   |
sq m |
61.50 |
4,920.00 |
55.00 |
4,400.00 |
75.00 |
6,000.00 |
|
|
| 711-04 |
geotextile fabric
|
85   |
sq m |
4.00 |
340.00 |
3.00 |
255.00 |
5.00 |
425.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (100 mm thick)
|
18   |
sq m |
52.50 |
945.00 |
70.00 |
1,260.00 |
45.00 |
810.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
255,000.00 |
255,000.00 |
400,000.00 |
400,000.00 |
100,000.00 |
100,000.00 |
|
|
| 713-03-C |
temporary pavement markings (200 mm width)
|
1,440   |
ln m |
0.98 |
1,411.20 |
1.00 |
1,440.00 |
1.03 |
1,483.20 |
|
|
| 713-03-E |
temporary pavement markings (600 mm width)
|
1,458   |
ln m |
2.95 |
4,301.10 |
3.00 |
4,374.00 |
3.10 |
4,519.80 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(100 mm width)
(1.2 m length) |
3.170 |
km |
210.35 |
666.80 |
1,100.00 |
3,487.00 |
180.00 |
570.60 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
20.830 |
km |
215.00 |
4,478.45 |
235.00 |
4,895.05 |
225.00 |
4,686.75 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
160.560 |
km |
310.00 |
49,773.60 |
340.00 |
54,590.40 |
325.00 |
52,182.00 |
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
1,236   |
ea |
77.25 |
95,481.00 |
160.00 |
197,760.00 |
100.00 |
123,600.00 |
|
|
| 716-01-B |
mulch (fiber)
|
85.0 |
hctr |
1,290.00 |
109,650.00 |
1,300.00 |
110,500.00 |
1,700.00 |
144,500.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
32,000.00 |
32,000.00 |
|
|
| 725-02 |
temporary detour roads
|
4,244.2 |
sq m |
44.76 |
189,970.39 |
64.00 |
271,628.80 |
80.00 |
339,536.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
255,000.00 |
255,000.00 |
600,000.00 |
600,000.00 |
1,800,000.00 |
1,800,000.00 |
|
|
| 729-01 |
sign (type a)
|
68.49 |
sq m |
225.00 |
15,410.25 |
170.00 |
11,643.30 |
160.00 |
10,958.40 |
|
|
| 729-04 |
sign (type d)
|
236.88 |
sq m |
193.00 |
45,717.84 |
180.00 |
42,638.40 |
170.00 |
40,269.60 |
|
|
| 729-05 |
sign (type e)
|
10.36 |
sq m |
233.50 |
2,419.06 |
250.00 |
2,590.00 |
250.00 |
2,590.00 |
|
|
| 729-06 |
sign (overhead mounted)
|
12.09 |
sq m |
257.50 |
3,113.17 |
230.00 |
2,780.70 |
215.00 |
2,599.35 |
|
|
| 729-08-A |
mounting (63.5 mm post)
|
11   |
ea |
550.00 |
6,050.00 |
600.00 |
6,600.00 |
560.00 |
6,160.00 |
|
|
| 729-08-B |
mounting (88.9 mm post)
|
27   |
ea |
630.00 |
17,010.00 |
600.00 |
16,200.00 |
590.00 |
15,930.00 |
|
|
| 729-08-E |
mounting (s75 x 8.5 post)
|
2   |
ea |
600.00 |
1,200.00 |
700.00 |
1,400.00 |
680.00 |
1,360.00 |
|
|
| 729-08-F |
mounting (w150 x 18 post)
|
20   |
ea |
650.00 |
13,000.00 |
800.00 |
16,000.00 |
800.00 |
16,000.00 |
|
|
| 729-08-H |
mounting (w200 x 36 post)
|
14   |
ea |
1,100.00 |
15,400.00 |
1,300.00 |
18,200.00 |
1,300.00 |
18,200.00 |
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
2   |
ea |
5,000.00 |
10,000.00 |
5,200.00 |
10,400.00 |
5,000.00 |
10,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
ea |
60.00 |
960.00 |
80.00 |
1,280.00 |
85.00 |
1,360.00 |
|
|
| 729-17 |
milepost assembly (ground mounted)
|
12   |
ea |
170.00 |
2,040.00 |
160.00 |
1,920.00 |
155.00 |
1,860.00 |
|
|
| 729-18 |
milepost assembly (structure mounted)
|
2   |
ea |
170.00 |
340.00 |
130.00 |
260.00 |
135.00 |
270.00 |
|
|
| 729-21 |
u-channel post
|
3   |
ea |
80.00 |
240.00 |
60.00 |
180.00 |
60.00 |
180.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
162   |
ea |
8.60 |
1,393.20 |
9.00 |
1,458.00 |
9.00 |
1,458.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,085   |
ea |
5.40 |
16,659.00 |
6.00 |
18,510.00 |
5.60 |
17,276.00 |
|
|
| 732-01-C |
plastic pavement striping (200 mm width)
|
765   |
ln m |
2.65 |
2,027.25 |
3.00 |
2,295.00 |
2.75 |
2,103.75 |
|
|
| 732-01-E |
plastic pavement striping (600 mm width)
|
2,073   |
ln m |
7.95 |
16,480.35 |
9.00 |
18,657.00 |
8.35 |
17,309.55 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
54.090 |
km |
1,102.00 |
59,607.18 |
1,200.00 |
64,908.00 |
1,150.00 |
62,203.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
22.204 |
km |
435.00 |
9,658.74 |
475.00 |
10,546.90 |
455.00 |
10,102.82 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
ea |
136.00 |
544.00 |
150.00 |
600.00 |
140.00 |
560.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
ea |
190.00 |
760.00 |
210.00 |
840.00 |
200.00 |
800.00 |
|
|
| 732-05 |
removal of existing markings
|
22.016 |
km |
2,175.00 |
47,884.80 |
2,400.00 |
52,838.40 |
2,300.00 |
50,636.80 |
|
|
| 734-01 |
rubblizing p.c.c. pavement
|
124,966   |
sq m |
3.32 |
414,887.12 |
3.50 |
437,381.00 |
4.50 |
562,347.00 |
|
|
| 739-01 |
hydro-seeding
|
85.0 |
hctr |
1,680.00 |
142,800.00 |
2,900.00 |
246,500.00 |
1,700.00 |
144,500.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
27,000.00 |
27,000.00 |
75,000.00 |
75,000.00 |
50,000.00 |
50,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
lump |
70,000.00 |
70,000.00 |
40,000.00 |
40,000.00 |
160,000.00 |
160,000.00 |
|
|
| S-001 |
bridge expansion joint repair
|
5   |
each |
22,500.00 |
112,500.00 |
19,000.00 |
95,000.00 |
12,000.00 |
60,000.00 |
|
|
| S-002 |
rumble strips(ground-in)
|
35.7 |
km |
569.77 |
20,340.78 |
350.00 |
12,495.00 |
325.00 |
11,602.50 |
|
|
| S-004 |
remove and remount existing logos
|
10   |
ea |
40.00 |
400.00 |
90.00 |
900.00 |
85.00 |
850.00 |
|
|
| S-005 |
impact attenuators (construction zone)
|
6   |
each |
18,900.00 |
113,400.00 |
21,000.00 |
126,000.00 |
20,000.00 |
120,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
10,677,124.38 |
|
12,937,684.05 |
|
15,207,563.41 |
|
|
|