| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
416   |
LNFT |
4.00 |
1,664.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
6,000   |
CUYD |
8.00 |
48,000.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
400   |
CUYD |
10.00 |
4,000.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (level 1)
|
28,061.9 |
TON |
49.00 |
1,375,033.10 |
|
|
|
|
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
1,000.0 |
TON |
20.00 |
20,000.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
97,912   |
SQYD |
1.46 |
142,951.52 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,040   |
CUYD |
0.01 |
- 20.40 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
6   |
LNFT |
150.00 |
900.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
500.00 |
500.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
62.5 |
LNFT |
14.00 |
875.00 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
27.00 |
1,350.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
32.00 |
3,200.00 |
|
|
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
1,800.00 |
7,200.00 |
|
|
|
|
|
|
| 707-04 |
asphaltic curb
|
190.0 |
LNFT |
1.00 |
190.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
74,500.00 |
74,500.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
19.367 |
MILE |
1.00 |
19.36 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.341 |
MILE |
1.00 |
8.34 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
65.577 |
MILE |
1.00 |
65.57 |
|
|
|
|
|
|
| 716-01-B |
mulch (fiber)
|
13.83 |
ACRE |
550.00 |
7,606.50 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
2,000   |
SQYD |
20.00 |
40,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
74,500.00 |
74,500.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
12   |
EACH |
55.00 |
660.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
65.00 |
260.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,175   |
EACH |
5.20 |
11,310.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
370   |
LNFT |
2.94 |
1,087.80 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
32.570 |
MILE |
1,760.00 |
57,323.20 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.828 |
MILE |
592.00 |
2,858.17 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
29   |
EACH |
5.00 |
145.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
21   |
EACH |
125.00 |
2,625.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
150.00 |
600.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
13.83 |
ACRE |
900.00 |
12,447.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
35,000.00 |
35,000.00 |
|
|
|
|
|
|
| S-001 |
cement treated base course (12 in depth)
|
67,315   |
SQYD |
5.91 |
397,831.65 |
|
|
|
|
|
|
| S-002 |
rumble strips (ground in)
|
19.0 |
MILE |
690.00 |
13,110.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,339,800.81 |
|
|
|
|
|
|
|