Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 033-04-0016
Parish: RAPIDES
Routes: LA 115
Description: AVOYELLES PARISH - JCT. LA 1207
Type Const: cold planing asphaltic concrete, superpave asphaltic concrete overlay, pavement
patching,and related work.
 
RankLicenseBidderAmount
105789 D & J CONSTRUCTION CO., INC. $982,214.78
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $986,066.85
312312 GILCHRIST CONSTRUCTION CO. LLC $1,071,617.54
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 344      SQYD 7.00 2,408.00 3.00 1,032.00 10.00 3,440.00    
202-02-H removal of guard rail 416      LNFT 6.00 2,496.00 4.00 1,664.00 5.00 2,080.00    
203-08 borrow (vehicular measurement) 150      CUYD 40.00 6,000.00 20.00 3,000.00 20.00 3,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
3,269      CUYD 5.00 16,345.00 13.00 42,497.00 27.50 89,897.50    
502-01-A superpave asphaltic concrete (level 1) 11,572.5    TON 42.00 486,045.00 43.21 500,047.72 40.00 462,900.00    
502-01-D superpave asphaltic concrete, incidental paving (level
a)
2,215.0    TON 65.00 143,975.00 68.24 151,151.60 60.00 132,900.00    
507-01-B asphaltic surface treatment (2 applications) 52,714      SQYD 1.95 102,792.30 2.05 108,063.70 2.00 105,428.00    
509-01 cold planing asphaltic pavement 52,714      SQYD 0.90 47,442.60 0.76 40,062.64 1.00 52,714.00    
509-02 contractor retained reclaimed asphaltic pavement - 2,759      CUYD 0.01 - 27.59 0.15 - 413.85 1.00 - 2,759.00    
704-03 blocked out guard rail 162.6    LNFT 15.00 2,439.00 15.75 2,560.95 16.00 2,601.60    
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 25.00 1,250.00 34.00 1,700.00 34.50 1,725.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 40.00 4,000.00 34.00 3,400.00 35.00 3,500.00    
704-11-A guard rail end treatment (flared) 4      EACH 1,650.00 6,600.00 1,700.00 6,800.00 1,700.00 6,800.00    
706-02-C concrete drive (6" thick) 344.4    SQYD 40.00 13,776.00 42.00 14,464.80 45.00 15,498.00    
713-01 temporary signs & barricades lump      LUMP 9,000.00 9,000.00 4,400.00 4,400.00 10,000.00 10,000.00    
713-03-E temporary pavement markings (24" width) 66      LNFT 4.50 297.00 0.63 41.58 0.65 42.90    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.252  MILE 160.00 1,960.32 210.00 2,572.92 325.00 3,981.90    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
10.338  MILE 1.00 10.33 210.00 2,170.98 215.00 2,222.67    
713-05-A temporary pavement markings (solid line)(4" width) 30.374  MILE 1.00 30.37 420.00 12,757.08 430.00 13,060.82    
713-07 temporary reflectorized raised pavement markers 1,080      EACH 1.00 1,080.00 1.31 1,414.80 0.40 432.00    
714-02 water 7.5    MGAL 1.00 7.50 1.00 7.50 10.00 75.00    
724-01-B pavement patching (12" minimum thickness) 500      SQYD 85.00 42,500.00 42.00 21,000.00 75.00 37,500.00    
727-01 mobilization lump      LUMP 50,000.00 50,000.00 20,000.00 20,000.00 80,000.00 80,000.00    
729-16-C object marker assembly (type 3) 4      EACH 65.00 260.00 68.00 272.00 70.00 280.00    
731-02 reflectorized raised pavement markers 540      EACH 5.00 2,700.00 5.00 2,700.00 5.00 2,700.00    
732-01-E plastic pavement striping (24" width) 33      LNFT 16.00 528.00 3.15 103.95 3.25 107.25    
732-02-A plastic pavement striping (solid line) (4" width) 10.125  MILE 1,950.00 19,743.75 1,760.00 17,820.00 1,800.00 18,225.00    
732-03-A plastic pavement striping (broken line)(4" width) 3.446  MILE 700.00 2,412.20 630.00 2,170.98 650.00 2,239.90    
735-01 mailboxes 109      EACH 1.00 109.00 13.00 1,417.00 20.00 2,180.00    
735-02 mailbox supports (single) 89      EACH 85.00 7,565.00 130.00 11,570.00 105.00 9,345.00    
735-03 mailbox supports (double) 6      EACH 120.00 720.00 200.00 1,200.00 150.00 900.00    
735-04 mailbox supports (multiple) 2      EACH 250.00 500.00 350.00 700.00 275.00 550.00    
739-01 hydro-seeding 0.25   ACRE 5,000.00 1,250.00 2,100.00 525.00 2,200.00 550.00    
740-01 construction layout lump      LUMP 6,000.00 6,000.00 7,192.50 7,192.50 7,500.00 7,500.00    
                       
 CONTRACTOR TOTAL       982,214.78   986,066.85   1,071,617.54