Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 031-06-0044
Parish: CALCASIEU
Routes: LA 27
Description: JCT. U.S. 90 - JCT. LA. 12
Type Const: grading, cold planing asphaltic pavement, pavement patching, superpave asphaltic
concrete overlay, and related work.
 
RankLicenseBidderAmount
134356 PRAIRIE CONTRACTORS INC. $3,012,787.31
212487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,202,000.84
300183 R. E. HEIDT CONSTRUCTION CO., INC. $3,208,820.01
428665 GILBERT SOUTHERN CORP $4,644,486.62
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 4 -
GILBERT SOUTHERN CORP
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 214      SQYD 9.00 1,926.00 5.25 1,123.50 5.30 1,134.20 10.00 2,140.00
202-02-E removal of concrete curbs 282.5    LNFT 6.00 1,695.00 8.40 2,373.00 8.45 2,387.12 6.00 1,695.00
202-02-G removal of surfacing & stabilized base 30.4    SQYD 5.00 152.00 3.15 95.76 3.20 97.28 5.00 152.00
202-02-H removal of guard rail 764      LNFT 3.00 2,292.00 3.15 2,406.60 12.00 9,168.00 3.00 2,292.00
203-08 borrow (vehicular measurement) 500      CUYD 12.00 6,000.00 18.82 9,410.00 28.85 14,425.00 30.00 15,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
205      CUYD 52.00 10,660.00 15.00 3,075.00 55.70 11,418.50 70.00 14,350.00
502-01-B-01 superpave asphaltic conc wearing course (level 2f) 53,227.7    TON 43.50 2,315,404.95 43.94 2,338,825.13 45.35 2,413,876.19 61.50 3,273,503.55
502-01-D superpave asphaltic concrete, incidental paving (level
a)
1,909.7    TON 5.00 9,548.50 83.26 159,001.62 75.00 143,227.50 93.00 177,602.10
509-01 cold planing asphaltic pavement 459,690      SQYD 0.25 114,922.50 0.56 257,426.40 0.45 206,860.50 0.78 358,558.20
509-02 contractor retained reclaimed asphaltic pavement - 12,770      CUYD 0.01 - 127.70 0.15 - 1,915.50 1.00 - 12,770.00 0.01 - 127.70
704-03 blocked out guard rail 450.4    LNFT 14.00 6,305.60 14.44 6,503.77 14.50 6,530.80 13.75 6,193.00
704-07-A guard rail bridge attachments (single thrie beam) 100.0    LNFT 32.00 3,200.00 32.55 3,255.00 32.70 3,270.00 31.00 3,100.00
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 35.00 7,000.00 35.70 7,140.00 35.85 7,170.00 34.00 6,800.00
704-11-A guard rail end treatment (flared) 8      EACH 1,600.00 12,800.00 1,625.00 13,000.00 1,640.00 13,120.00 1,550.00 12,400.00
706-01-A concrete walk (4" thick) 244.4    SQYD 40.00 9,776.00 37.80 9,238.32 38.00 9,287.20 38.00 9,287.20
707-01 concrete curb 771.8    LNFT 16.00 12,348.80 15.75 12,155.85 15.80 12,194.44 16.00 12,348.80
713-01 temporary signs & barricades lump      LUMP 124,000.00 124,000.00 3,600.00 3,600.00 15,900.00 15,900.00 30,000.00 30,000.00
713-03-C temporary pavement markings (8" width) 1,712      LNFT 0.01 17.12 0.21 359.52 0.21 359.52 0.30 513.60
713-03-E temporary pavement markings (24" width) 2,942      LNFT 0.01 29.42 0.63 1,853.46 0.63 1,853.46 1.32 3,883.44
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
40.120  MILE 250.00 10,030.00 210.00 8,425.20 190.00 7,622.80 300.00 12,036.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
40.120  MILE 1.00 40.12 210.00 8,425.20 210.00 8,425.20 286.00 11,474.32
713-05-A temporary pavement markings (solid line)(4" width) 77.000  MILE 1.00 77.00 420.00 32,340.00 420.00 32,340.00 465.00 35,805.00
713-06-A temporary pavement legends and symbols (arrow) 116      EACH 1.00 116.00 52.50 6,090.00 52.75 6,119.00 54.00 6,264.00
713-06-D temporary pavement legends and symbols (rr crossing) 22      EACH 1.00 22.00 210.00 4,620.00 210.00 4,620.00 54.00 1,188.00
724-01-B pavement patching (12" minimum thickness) 1,348      SQYD 48.00 64,704.00 76.26 102,798.48 53.35 71,915.80 48.00 64,704.00
727-01 mobilization lump      LUMP 163,000.00 163,000.00 59,000.00 59,000.00 66,000.00 66,000.00 434,355.00 434,355.00
729-16-B object marker assembly (type 2) 20      EACH 60.00 1,200.00 52.50 1,050.00 52.75 1,055.00 50.00 1,000.00
729-16-C object marker assembly (type 3) 8      EACH 80.00 640.00 63.00 504.00 63.25 506.00 60.00 480.00
731-02 reflectorized raised pavement markers 3,044      EACH 4.50 13,698.00 5.00 15,220.00 4.75 14,459.00 4.95 15,067.80
732-01-C plastic pavement striping (8" width) 856      LNFT 1.00 856.00 1.05 898.80 1.05 898.80 0.80 684.80
732-01-E plastic pavement striping (24" width) 1,471      LNFT 3.00 4,413.00 3.15 4,633.65 3.20 4,707.20 2.45 3,603.95
732-02-A plastic pavement striping (solid line) (4" width) 38.500  MILE 1,700.00 65,450.00 1,760.00 67,760.00 1,770.00 68,145.00 1,776.00 68,376.00
732-03-A plastic pavement striping (broken line)(4" width) 20.060  MILE 650.00 13,039.00 683.00 13,700.98 690.00 13,841.40 601.00 12,056.06
732-04-A plastic pavement legends & symbols (arrow) 58      EACH 150.00 8,700.00 157.00 9,106.00 160.00 9,280.00 136.00 7,888.00
732-04-D plastic pavement legends & symbols (rr crossing) 11      EACH 400.00 4,400.00 420.00 4,620.00 420.00 4,620.00 400.00 4,400.00
735-01 mailboxes 102      EACH 1.00 102.00 1.05 107.10 1.05 107.10 10.00 1,020.00
735-02 mailbox supports (single) 100      EACH 90.00 9,000.00 105.00 10,500.00 125.00 12,500.00 85.00 8,500.00
735-03 mailbox supports (double) 2      EACH 150.00 300.00 150.00 300.00 180.00 360.00 130.00 260.00
735-04 mailbox supports (multiple) 1      EACH 300.00 300.00 315.00 315.00 345.00 345.00 250.00 250.00
740-01 construction layout lump      LUMP 100.00 100.00 4,200.00 4,200.00 6,500.00 6,500.00 10,000.00 10,000.00
S-001 rumble strips (ground-in) 29.3    MILE 500.00 14,650.00 630.00 18,459.00 510.00 14,943.00 525.00 15,382.50
                       
 CONTRACTOR TOTAL       3,012,787.31   3,202,000.84   3,208,820.01   4,644,486.62