| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PRAIRIE CONTRACTORS INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 4 - GILBERT SOUTHERN CORP |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
214   |
SQYD |
9.00 |
1,926.00 |
5.25 |
1,123.50 |
5.30 |
1,134.20 |
10.00 |
2,140.00 |
| 202-02-E |
removal of concrete curbs
|
282.5 |
LNFT |
6.00 |
1,695.00 |
8.40 |
2,373.00 |
8.45 |
2,387.12 |
6.00 |
1,695.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
30.4 |
SQYD |
5.00 |
152.00 |
3.15 |
95.76 |
3.20 |
97.28 |
5.00 |
152.00 |
| 202-02-H |
removal of guard rail
|
764   |
LNFT |
3.00 |
2,292.00 |
3.15 |
2,406.60 |
12.00 |
9,168.00 |
3.00 |
2,292.00 |
| 203-08 |
borrow (vehicular measurement)
|
500   |
CUYD |
12.00 |
6,000.00 |
18.82 |
9,410.00 |
28.85 |
14,425.00 |
30.00 |
15,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
205   |
CUYD |
52.00 |
10,660.00 |
15.00 |
3,075.00 |
55.70 |
11,418.50 |
70.00 |
14,350.00 |
| 502-01-B-01 |
superpave asphaltic conc wearing course (level 2f)
|
53,227.7 |
TON |
43.50 |
2,315,404.95 |
43.94 |
2,338,825.13 |
45.35 |
2,413,876.19 |
61.50 |
3,273,503.55 |
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
1,909.7 |
TON |
5.00 |
9,548.50 |
83.26 |
159,001.62 |
75.00 |
143,227.50 |
93.00 |
177,602.10 |
| 509-01 |
cold planing asphaltic pavement
|
459,690   |
SQYD |
0.25 |
114,922.50 |
0.56 |
257,426.40 |
0.45 |
206,860.50 |
0.78 |
358,558.20 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 12,770   |
CUYD |
0.01 |
- 127.70 |
0.15 |
- 1,915.50 |
1.00 |
- 12,770.00 |
0.01 |
- 127.70 |
| 704-03 |
blocked out guard rail
|
450.4 |
LNFT |
14.00 |
6,305.60 |
14.44 |
6,503.77 |
14.50 |
6,530.80 |
13.75 |
6,193.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
100.0 |
LNFT |
32.00 |
3,200.00 |
32.55 |
3,255.00 |
32.70 |
3,270.00 |
31.00 |
3,100.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
35.00 |
7,000.00 |
35.70 |
7,140.00 |
35.85 |
7,170.00 |
34.00 |
6,800.00 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
1,600.00 |
12,800.00 |
1,625.00 |
13,000.00 |
1,640.00 |
13,120.00 |
1,550.00 |
12,400.00 |
| 706-01-A |
concrete walk (4" thick)
|
244.4 |
SQYD |
40.00 |
9,776.00 |
37.80 |
9,238.32 |
38.00 |
9,287.20 |
38.00 |
9,287.20 |
| 707-01 |
concrete curb
|
771.8 |
LNFT |
16.00 |
12,348.80 |
15.75 |
12,155.85 |
15.80 |
12,194.44 |
16.00 |
12,348.80 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
124,000.00 |
124,000.00 |
3,600.00 |
3,600.00 |
15,900.00 |
15,900.00 |
30,000.00 |
30,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
1,712   |
LNFT |
0.01 |
17.12 |
0.21 |
359.52 |
0.21 |
359.52 |
0.30 |
513.60 |
| 713-03-E |
temporary pavement markings (24" width)
|
2,942   |
LNFT |
0.01 |
29.42 |
0.63 |
1,853.46 |
0.63 |
1,853.46 |
1.32 |
3,883.44 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
40.120 |
MILE |
250.00 |
10,030.00 |
210.00 |
8,425.20 |
190.00 |
7,622.80 |
300.00 |
12,036.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
40.120 |
MILE |
1.00 |
40.12 |
210.00 |
8,425.20 |
210.00 |
8,425.20 |
286.00 |
11,474.32 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
77.000 |
MILE |
1.00 |
77.00 |
420.00 |
32,340.00 |
420.00 |
32,340.00 |
465.00 |
35,805.00 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
116   |
EACH |
1.00 |
116.00 |
52.50 |
6,090.00 |
52.75 |
6,119.00 |
54.00 |
6,264.00 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
22   |
EACH |
1.00 |
22.00 |
210.00 |
4,620.00 |
210.00 |
4,620.00 |
54.00 |
1,188.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,348   |
SQYD |
48.00 |
64,704.00 |
76.26 |
102,798.48 |
53.35 |
71,915.80 |
48.00 |
64,704.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
163,000.00 |
163,000.00 |
59,000.00 |
59,000.00 |
66,000.00 |
66,000.00 |
434,355.00 |
434,355.00 |
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
60.00 |
1,200.00 |
52.50 |
1,050.00 |
52.75 |
1,055.00 |
50.00 |
1,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
80.00 |
640.00 |
63.00 |
504.00 |
63.25 |
506.00 |
60.00 |
480.00 |
| 731-02 |
reflectorized raised pavement markers
|
3,044   |
EACH |
4.50 |
13,698.00 |
5.00 |
15,220.00 |
4.75 |
14,459.00 |
4.95 |
15,067.80 |
| 732-01-C |
plastic pavement striping (8" width)
|
856   |
LNFT |
1.00 |
856.00 |
1.05 |
898.80 |
1.05 |
898.80 |
0.80 |
684.80 |
| 732-01-E |
plastic pavement striping (24" width)
|
1,471   |
LNFT |
3.00 |
4,413.00 |
3.15 |
4,633.65 |
3.20 |
4,707.20 |
2.45 |
3,603.95 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
38.500 |
MILE |
1,700.00 |
65,450.00 |
1,760.00 |
67,760.00 |
1,770.00 |
68,145.00 |
1,776.00 |
68,376.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
20.060 |
MILE |
650.00 |
13,039.00 |
683.00 |
13,700.98 |
690.00 |
13,841.40 |
601.00 |
12,056.06 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
58   |
EACH |
150.00 |
8,700.00 |
157.00 |
9,106.00 |
160.00 |
9,280.00 |
136.00 |
7,888.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
11   |
EACH |
400.00 |
4,400.00 |
420.00 |
4,620.00 |
420.00 |
4,620.00 |
400.00 |
4,400.00 |
| 735-01 |
mailboxes
|
102   |
EACH |
1.00 |
102.00 |
1.05 |
107.10 |
1.05 |
107.10 |
10.00 |
1,020.00 |
| 735-02 |
mailbox supports (single)
|
100   |
EACH |
90.00 |
9,000.00 |
105.00 |
10,500.00 |
125.00 |
12,500.00 |
85.00 |
8,500.00 |
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
150.00 |
300.00 |
150.00 |
300.00 |
180.00 |
360.00 |
130.00 |
260.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
300.00 |
300.00 |
315.00 |
315.00 |
345.00 |
345.00 |
250.00 |
250.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
100.00 |
100.00 |
4,200.00 |
4,200.00 |
6,500.00 |
6,500.00 |
10,000.00 |
10,000.00 |
| S-001 |
rumble strips (ground-in)
|
29.3 |
MILE |
500.00 |
14,650.00 |
630.00 |
18,459.00 |
510.00 |
14,943.00 |
525.00 |
15,382.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,012,787.31 |
|
3,202,000.84 |
|
3,208,820.01 |
|
4,644,486.62 |
|