| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RICHARD PRICE CONTRACTING CO., LLC |
- 2 - R-K CONTRACTORS, L.L.C. |
- 3 - BARRIERE CONSTRUCTION CO., LLC. |
- 4 - COMMAND CONSTRUCTION LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
3,000.00 |
3,000.00 |
854.23 |
854.23 |
500.00 |
500.00 |
100.00 |
100.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
1,800.00 |
1,800.00 |
500.00 |
500.00 |
100.00 |
100.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
300   |
SQYD |
6.00 |
1,800.00 |
10.12 |
3,036.00 |
11.00 |
3,300.00 |
1.00 |
300.00 |
| 202-02-D |
removal of concrete walks & drives
|
869   |
SQYD |
6.50 |
5,648.50 |
8.23 |
7,151.87 |
13.00 |
11,297.00 |
1.00 |
869.00 |
| 202-02-E |
removal of concrete curbs
|
376.0 |
LNFT |
5.00 |
1,880.00 |
6.33 |
2,380.08 |
5.00 |
1,880.00 |
40.00 |
15,040.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
297.3 |
LNFT |
5.00 |
1,486.50 |
8.86 |
2,634.07 |
5.00 |
1,486.50 |
40.00 |
11,892.00 |
| 202-02-I |
removal of existing signal equipment
|
lump |
LUMP |
1,350.00 |
1,350.00 |
1,350.00 |
1,350.00 |
1,400.00 |
1,400.00 |
500.00 |
500.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
7,000.00 |
7,000.00 |
8,000.00 |
8,000.00 |
6,300.00 |
6,300.00 |
3,000.00 |
3,000.00 |
| 302-02-D-01 |
class ii base course (12" thick)(crushed stone or
recycled pccp) |
385.5 |
SQYD |
20.00 |
7,710.00 |
24.90 |
9,598.95 |
22.00 |
8,481.00 |
40.00 |
15,420.00 |
| 302-02-E |
class ii base course (8" thick) (crushed stone or
recycled pccp) |
633.2 |
SQYD |
14.00 |
8,864.80 |
17.09 |
10,821.38 |
14.00 |
8,864.80 |
38.00 |
24,061.60 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
50.00 |
5,000.00 |
69.60 |
6,960.00 |
41.00 |
4,100.00 |
1.00 |
100.00 |
| 502-01-B |
superpave asphaltic concrete (level 2)
|
33.0 |
TON |
260.00 |
8,580.00 |
261.35 |
8,624.55 |
343.00 |
11,319.00 |
250.00 |
8,250.00 |
| 502-01-B-01 |
superpave asphaltic conc wearing course (level 2f)
|
33.0 |
TON |
251.00 |
8,283.00 |
254.28 |
8,391.24 |
343.00 |
11,319.00 |
300.00 |
9,900.00 |
| 601-01-K |
portland cement concrete pavement (10" thick)
|
856.5 |
SQYD |
44.00 |
37,686.00 |
46.20 |
39,570.30 |
44.00 |
37,686.00 |
70.00 |
59,955.00 |
| 601-04 |
portland cement concrete pavement coring
|
2   |
EACH |
300.00 |
600.00 |
96.18 |
192.36 |
65.00 |
130.00 |
100.00 |
200.00 |
| 602-05-H-02 |
full depth patching of jointed conc pvmt (8 1/2" thick)
(16.1-48.0 sq yds) |
39.1 |
SQYD |
120.00 |
4,692.00 |
132.88 |
5,195.60 |
105.00 |
4,105.50 |
100.00 |
3,910.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
25   |
LNFT |
45.00 |
1,125.00 |
88.59 |
2,214.75 |
130.00 |
3,250.00 |
40.00 |
1,000.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
24   |
LNFT |
90.00 |
2,160.00 |
92.38 |
2,217.12 |
135.00 |
3,240.00 |
45.00 |
1,080.00 |
| 702-03-C |
catch basins (cb-06)
|
5   |
EACH |
3,000.00 |
15,000.00 |
1,500.00 |
7,500.00 |
3,000.00 |
15,000.00 |
2,800.00 |
14,000.00 |
| 702-04-B |
adjusting catch basins
|
4   |
EACH |
1,500.00 |
6,000.00 |
1,000.00 |
4,000.00 |
1,500.00 |
6,000.00 |
250.00 |
1,000.00 |
| 706-02-C |
concrete drive (6" thick)
|
352.8 |
SQYD |
38.00 |
13,406.40 |
28.33 |
9,994.82 |
53.00 |
18,698.40 |
25.00 |
8,820.00 |
| 707-01 |
concrete curb
|
374.0 |
LNFT |
7.00 |
2,618.00 |
8.23 |
3,078.02 |
15.00 |
5,610.00 |
22.00 |
8,228.00 |
| 707-03 |
combination concrete curb & gutter
|
297.0 |
LNFT |
18.00 |
5,346.00 |
12.66 |
3,760.02 |
24.00 |
7,128.00 |
25.00 |
7,425.00 |
| 708-01 |
right-of-way monument
|
3   |
EACH |
250.00 |
750.00 |
82.26 |
246.78 |
400.00 |
1,200.00 |
25.00 |
75.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
14,000.00 |
14,000.00 |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
100.00 |
100.00 |
| 714-02 |
water
|
2.0 |
MGAL |
100.00 |
200.00 |
569.49 |
1,138.98 |
8.00 |
16.00 |
1.00 |
2.00 |
| 717-01 |
seeding
|
2   |
LB |
400.00 |
800.00 |
31.64 |
63.28 |
8.00 |
16.00 |
10.00 |
20.00 |
| 718-01 |
fertilizer
|
80   |
LB |
3.00 |
240.00 |
4.11 |
328.80 |
0.20 |
16.00 |
1.00 |
80.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
12,000.00 |
12,000.00 |
20,000.00 |
20,000.00 |
12,000.00 |
12,000.00 |
10,000.00 |
10,000.00 |
| 729-01 |
sign (type a)
|
36.0 |
SQFT |
33.00 |
1,188.00 |
32.85 |
1,182.60 |
34.00 |
1,224.00 |
30.00 |
1,080.00 |
| 731-02 |
reflectorized raised pavement markers
|
50   |
EACH |
6.00 |
300.00 |
5.96 |
298.00 |
6.00 |
300.00 |
6.00 |
300.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
250   |
LNFT |
1.00 |
250.00 |
0.91 |
227.50 |
0.90 |
225.00 |
1.00 |
250.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
110   |
LNFT |
2.75 |
302.50 |
2.74 |
301.40 |
2.70 |
297.00 |
2.00 |
220.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.600 |
MILE |
2,167.00 |
3,467.20 |
2,200.00 |
3,520.00 |
2,200.00 |
3,520.00 |
2,000.00 |
3,200.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
8   |
EACH |
150.00 |
1,200.00 |
151.46 |
1,211.68 |
150.00 |
1,200.00 |
150.00 |
1,200.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
209.00 |
418.00 |
211.60 |
423.20 |
210.00 |
420.00 |
200.00 |
400.00 |
| 732-05 |
removal of existing markings
|
0.006 |
MILE |
4,620.00 |
27.72 |
4,700.00 |
28.20 |
4,900.00 |
29.40 |
7,000.00 |
42.00 |
| 736-01 |
trenching & backfilling
|
30   |
LNFT |
5.00 |
150.00 |
4.74 |
142.20 |
5.00 |
150.00 |
4.50 |
135.00 |
| 736-04-A |
signal support (30' steel strain pole)
|
2   |
EACH |
6,100.00 |
12,200.00 |
6,200.00 |
12,400.00 |
6,500.00 |
13,000.00 |
5,500.00 |
11,000.00 |
| 736-05-A |
traffic signal head (3-section, 12"lens)(r,y,g)
|
4   |
EACH |
545.00 |
2,180.00 |
551.26 |
2,205.04 |
550.00 |
2,200.00 |
500.00 |
2,000.00 |
| 736-05-B |
traffic signal head (3-section, 12"lens)(r,y(rt. turn)
,g (rt.turn) |
6   |
EACH |
575.00 |
3,450.00 |
579.10 |
3,474.60 |
600.00 |
3,600.00 |
550.00 |
3,300.00 |
| 736-05-C |
signal heads (4-section, 12" lens) (r, y, g(rt. turn)g)
|
2   |
EACH |
677.00 |
1,354.00 |
684.90 |
1,369.80 |
700.00 |
1,400.00 |
650.00 |
1,300.00 |
| 736-09 |
loop detector
|
1,770   |
LNFT |
9.35 |
16,549.50 |
9.47 |
16,761.90 |
10.00 |
17,700.00 |
9.00 |
15,930.00 |
| 736-10-A |
underground junction box (type d)
|
2   |
EACH |
248.00 |
496.00 |
250.57 |
501.14 |
250.00 |
500.00 |
250.00 |
500.00 |
| 736-11-A |
conduit (2" hdpe)
|
15   |
LNFT |
5.00 |
75.00 |
4.63 |
69.45 |
4.50 |
67.50 |
4.00 |
60.00 |
| 736-11-B |
conduit (4" hdpe)
|
20   |
LNFT |
8.00 |
160.00 |
7.24 |
144.80 |
7.50 |
150.00 |
8.00 |
160.00 |
| 736-13-A |
cable (2c) shielded
|
575   |
LNFT |
1.20 |
690.00 |
1.17 |
672.75 |
1.20 |
690.00 |
1.00 |
575.00 |
| 736-13-B |
cable (6c) signal
|
1,635   |
LNFT |
1.95 |
3,188.25 |
1.95 |
3,188.25 |
2.00 |
3,270.00 |
2.00 |
3,270.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,500.00 |
5,500.00 |
8,000.00 |
8,000.00 |
6,500.00 |
6,500.00 |
100.00 |
100.00 |
| S-001 |
full-depth sawcutting of concrete pavement
|
714   |
LNFT |
11.00 |
7,854.00 |
10.12 |
7,225.68 |
9.50 |
6,783.00 |
30.00 |
21,420.00 |
| S-002 |
sawcuts in asphaltic concrete lifts
|
729   |
LNFT |
2.50 |
1,822.50 |
3.17 |
2,310.93 |
0.45 |
328.05 |
0.50 |
364.50 |
| S-003 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
574   |
LNFT |
4.00 |
2,296.00 |
5.70 |
3,271.80 |
1.30 |
746.20 |
0.50 |
287.00 |
| S-004 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
417   |
LNFT |
4.00 |
1,668.00 |
5.70 |
2,376.90 |
1.30 |
542.10 |
0.50 |
208.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
249,012.87 |
|
257,411.02 |
|
265,685.45 |
|
272,729.60 |
|