Line Number | Item | Description | Unit | Quantity |
| 0001 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 94 |
| 0002 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | SQYD | 44.7 |
| 0003 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | SQYD | 106.6 |
| 0004 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0005 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0006 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 2,966 |
| 0007 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.281 |
| 0008 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0009 | 815-03-00300 | Joint Seal (Poured) | LNFT | 314 |
| 0010 | 815-03-00400 | Joint Seal BRIDGE JOINT SEAL | LNFT | 60 |
| 0011 | 830-07-00100 | Structural Concrete Patching | SQFT | 12 |
| 0012 | NS-602-00014 | Pavement Repair System 2" AVERAGE DEPTH | CUFT | 150 |
| 0013 | NS-602-00014 | Pavement Repair System 4" AVERAGE DEPTH | CUFT | 333.1 |