Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-02-03030 | Removal of Pavement Structure | SQYD | 684.4 |
| 0003 | 202-02-04501 | Removal of Bridge Suppl Desc needed | LUMP | 1 |
| 0004 | 202-02-14500 | Removal of Guard Rail | LNFT | 410 |
| 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) Supple Desc needed | LNFT | 100 |
| 0006 | 203-01-00100 | General Excavation | CUYD | 527 |
| 0007 | 203-02-00100 | Drainage Excavation | CUYD | 922 |
| 0008 | 203-03-00100 | Embankment | CUYD | 75 |
| 0009 | 204-02-00100 | Temporary Hay Bales | EACH | 30 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | LNFT | 967 |
| 0011 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | SQYD | 871.1 |
| 0012 | 304-01-00100 | Lime | TON | 12.7 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | SQYD | 871 |
| 0014 | 502-01-00100 | Asphalt Concrete | TON | 262.5 |
| 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 74.4 |
| 0016 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 738 |
| 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -41 |
| 0018 | 510-05-00100 | Pavement Widening | TON | 52.8 |
| 0019 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | INLF | 2,112 |
| 0020 | 701-01-01041 | Cross Drain Pipe (36" RCP) | LNFT | 100 |
| 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 269 |
| 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 512.5 |
| 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
| 0024 | 711-01-04020 | Riprap (55 lb, 24" Thick) | SQYD | 131 |
| 0025 | 711-04-00100 | Geotextile Fabric | SQYD | 124 |
| 0026 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0027 | 713-11-00100 | Portable Changeable Message Signs | EACH | 4 |
| 0028 | 726-01-00100 | Bedding Material | CUYD | 76.4 |
| 0029 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0030 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 4 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 27 |
| 0032 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | LNFT | 2,160 |
| 0033 | 739-01-00100 | Hydro-Seeding | ACRE | 0.17 |
| 0034 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0035 | 805-13-02300 | Reinforced Concrete Box Culverts (Cast-In-Place or Precast) (10' x 8') | LNFT | 80 |
| 0036 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Quantity of Steel = 2022 LB
Quantity of Concrete = 39.90 CY | EACH | 2 |