Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-00030 | Removal of barrier | LNFT | 284 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 590.6 |
| 0003 | 202-02-03030 | Removal of Pavement Structure | SQYD | 7,789 |
| 0004 | 202-02-14500 | Removal of Guard Rail | LNFT | 866 |
| 0005 | 202-02-38220 | Removal of Sign Supports | EACH | 5 |
| 0006 | 202-02-38360 | Removal of Sign Faces | EACH | 5 |
| 0007 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 8 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | LNFT | 7,071 |
| 0010 | 302-01-00300 | Class II Base Course (Crushed Stone) | CUYD | 2,598 |
| 0011 | 302-03-00100 | Base Drain Outlet | EACH | 36 |
| 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 329 |
| 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 50 |
| 0014 | 502-01-00100 | Asphalt Concrete | TON | 3,270.3 |
| 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 150.7 |
| 0016 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 4,005 |
| 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -238 |
| 0018 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | LNFT | 56 |
| 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 68.8 |
| 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
| 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0023 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0024 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 0.7 |
| 0025 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 1.4 |
| 0026 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0027 | 729-01-00100 | Sign (Type A) | SQFT | 45 |
| 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0029 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | EACH | 5 |
| 0030 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | EACH | 3,308 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 460 |
| 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 3.672 |
| 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.211 |
| 0034 | 732-05-00100 | Removal of Existing Markings | MILE | 0.244 |
| 0035 | 739-01-00100 | Hydro-Seeding | ACRE | 5.5 |
| 0036 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0037 | 810-05-00100 | Concrete Roadway Barrier (Standard) | LNFT | 48 |
| 0038 | 815-03-00300 | Joint Seal (Poured) | LNFT | 1,750 |
| 0039 | NS-300-00060 | Geogrid | SQYD | 11,785 |
| 0040 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | LNFT | 56 |
| 0041 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 64 |
| 0042 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement 12" Deep | INLF | 2,892 |
| 0043 | NS-602-00001 | Milling Concrete Pavement | SQYD | 376.8 |
| 0044 | NS-DEV-30201 | Geocell Confinement System | SQYD | 11,785 |