Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) 2-30" CMP | LNFT | 96 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 134 |
| 0003 | 203-10-00100 | Cleaning Existing Ditches | LNFT | 200 |
| 0004 | 204-02-00100 | Temporary Hay Bales | EACH | 8 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | LNFT | 400 |
| 0006 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | SQYD | 161,289 |
| 0007 | 304-01-00100 | Lime | TON | 1,096.3 |
| 0008 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | SQYD | 77,339 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 30 |
| 0010 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 100 |
| 0011 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | SQYD | 150 |
| 0012 | 502-01-00100 | Asphalt Concrete | TON | 39,621.7 |
| 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 1,176.2 |
| 0014 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | GAL | 109,677 |
| 0015 | 507-02-00200 | Aggregate (S2) | SQYD | 161,289 |
| 0016 | 507-02-00300 | Aggregate (S3) | SQYD | 161,289 |
| 0017 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 177,942 |
| 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -15,094 |
| 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 35 |
| 0020 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | SQYD | 300 |
| 0021 | 701-01-01021 | Cross Drain Pipe (30" RCP) | LNFT | 96 |
| 0022 | 701-14-00100 | Cleaning Existing Pipes (30") | LNFT | 48 |
| 0023 | 711-03-00400 | Riprap (55 lb) | TON | 20 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0025 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 819 |
| 0026 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 3,465 |
| 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 12.466 |
| 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 12.466 |
| 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 96.606 |
| 0030 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | EACH | 9 |
| 0031 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | EACH | 6 |
| 0032 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | EACH | 9 |
| 0033 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | EACH | 15 |
| 0034 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | EACH | 6 |
| 0035 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | EACH | 6 |
| 0036 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | EACH | 3,626 |
| 0037 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0038 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 8.251 |
| 0039 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 18.261 |
| 0040 | 726-01-00100 | Bedding Material | CUYD | 49.2 |
| 0041 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0042 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 64 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 2,024 |
| 0044 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 1,155 |
| 0045 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 32.202 |
| 0046 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | MILE | 0.037 |
| 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 4.155 |
| 0048 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.015 |
| 0049 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | MILE | 0.064 |
| 0050 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | EACH | 3 |
| 0051 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 2 |
| 0052 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 3 |
| 0053 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | EACH | 5 |
| 0054 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 2 |
| 0055 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | EACH | 2 |
| 0056 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL) | EACH | 2 |
| 0057 | 732-05-00100 | Removal of Existing Markings | MILE | 0.014 |
| 0058 | 739-01-00100 | Hydro-Seeding | ACRE | 4.439 |
| 0059 | 740-01-00100 | Construction Layout | LUMP | 1 |