Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) APPROX. 0.610 ACRES | LUMP | 1 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement GUARD RAIL PADS | SQYD | 646.6 |
| 0003 | 202-02-14500 | Removal of Guard Rail | LNFT | 814 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 8 |
| 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 168 |
| 0006 | 502-01-00100 | Asphalt Concrete | TON | 15,853.2 |
| 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 514.5 |
| 0008 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 160,133 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -3,364 |
| 0010 | 510-01-00001 | Pavement Patching 9" MINIMUM THICKNESS | SQYD | 350 |
| 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 800 |
| 0012 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 250 |
| 0013 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | LNFT | 100 |
| 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 200 |
| 0015 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 8 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 13.762 |
| 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 8.975 |
| 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 42.404 |
| 0020 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 6.824 |
| 0021 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 13.648 |
| 0022 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0023 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 8 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,225 |
| 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 21.202 |
| 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 4.487 |
| 0027 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | MILE | 0.131 |
| 0028 | 732-05-00100 | Removal of Existing Markings | MILE | 0.057 |
| 0029 | 735-01-00100 | Mailboxes | EACH | 7 |
| 0030 | 735-02-00100 | Mailbox Supports (Single) | EACH | 7 |
| 0031 | 739-01-00100 | Hydro-Seeding | ACRE | 0.02 |
| 0032 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0033 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | LNFT | 108,090 |
| 0034 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | LNFT | 43,598 |
| 0035 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | LNFT | 151,688 |