Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 767 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | LNFT | 1,332.9 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 951 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 1,621 |
| 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 40 |
| 0006 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | SQYD | 89,118 |
| 0007 | 303-02-00100 | Removal of Existing Patches | SQYD | 50 |
| 0008 | 304-01-00100 | Lime | TON | 116.97 |
| 0009 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | SQYD | 22,281 |
| 0010 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | SQYD | 89,118 |
| 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 1,216 |
| 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 200 |
| 0013 | 502-01-00100 | Asphalt Concrete | TON | 32,708.2 |
| 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 1,201.1 |
| 0015 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 71,612 |
| 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -7,781 |
| 0017 | 701-14-00100 | Cleaning Existing Pipes | LNFT | 896 |
| 0018 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | EACH | 1 |
| 0019 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 543 |
| 0020 | 706-02-00300 | Concrete Drive (8" Thick) | SQYD | 408 |
| 0021 | 707-03-00100 | Combination Concrete Curb and Gutter | LNFT | 1,332.9 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 299 |
| 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 21.687 |
| 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 21.687 |
| 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 43.375 |
| 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0028 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 4.255 |
| 0029 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 8.508 |
| 0030 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 22 |
| 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 40 |
| 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,039 |
| 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 299 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 14.591 |
| 0036 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | MILE | 0.024 |
| 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 1.921 |
| 0038 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | MILE | 1.477 |
| 0039 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.047 |
| 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 2 |
| 0041 | 735-01-00100 | Mailboxes | EACH | 49 |
| 0042 | 735-02-00100 | Mailbox Supports (Single) | EACH | 49 |
| 0043 | 739-01-00100 | Hydro-Seeding | ACRE | 1.17 |
| 0044 | 740-01-00100 | Construction Layout | LUMP | 1 |