Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
| 0003 | 202-02-03030 | Removal of Pavement Structure | SQYD | 610 |
| 0004 | 202-02-04501 | Removal of Bridge (STA. 100+00, 12' W x 57.7' L, TIMBER BRIDGE) | LUMP | 1 |
| 0005 | 203-02-00100 | Drainage Excavation | CUYD | 411 |
| 0006 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | LNFT | 715 |
| 0008 | 302-01-00300 | Class II Base Course (Crushed Stone) | CUYD | 175.8 |
| 0009 | 302-03-00100 | Base Drain Outlet | EACH | 8 |
| 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 6 |
| 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 50 |
| 0012 | 502-01-00100 | Asphalt Concrete | TON | 147.5 |
| 0013 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 50 |
| 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
| 0015 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
| 0016 | 705-01-00100 | Barbed Wire Fence | LNFT | 57 |
| 0017 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 663 |
| 0018 | 711-04-00100 | Geotextile Fabric | SQYD | 663 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0020 | 716-01-00100 | Mulch (Vegetative) | TON | 0.4 |
| 0021 | 717-01-00100 | Seeding | LB | 10 |
| 0022 | 718-01-00100 | Fertilizer | LB | 222 |
| 0023 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0024 | 729-01-00102 | Sign (Type A)(Furnish and Install) | SQFT | 9 |
| 0025 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0026 | 735-01-00100 | Mailboxes | EACH | 3 |
| 0027 | 735-02-00100 | Mailbox Supports (Single) | EACH | 1 |
| 0028 | 735-03-00100 | Mailbox Supports (Double) | EACH | 1 |
| 0029 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0030 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 1,400 |
| 0031 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
| 0032 | 804-18-00100 | Vibration Monitoring | DAY | 10 |
| 0033 | 805-12-00100 | Bridge Superstructure and Substructure (24' Roadway, 90 Degree Crossing) (CAST-IN-PLACE) | SQFT | 1,920 |
| 0034 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 954 |
| 0035 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 954 |
| 0036 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (24' Roadway; 90 Degree Crossing, Without Asphalt) (10' Long) | SQFT | 500 |