Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-00020 | Removal of GUARD RAIL PAD | SQYD | 1,623 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 125 |
| 0003 | 202-02-14500 | Removal of Guard Rail | LNFT | 1,596 |
| 0004 | 203-03-00100 | Embankment | CUYD | 250 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 100 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,500 |
| 0007 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | SQYD | 502.3 |
| 0008 | 502-01-00100 | Asphalt Concrete | TON | 12,926.9 |
| 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 543.7 |
| 0010 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | GAL | 52,786 |
| 0011 | 507-02-00300 | Aggregate (S3) | SQYD | 170,281 |
| 0012 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 115,282 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -4,803 |
| 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 300 |
| 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 1,137.5 |
| 0016 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | LNFT | 100 |
| 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 200 |
| 0018 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 8 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0020 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 396 |
| 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 569 |
| 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 23.57 |
| 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 23.57 |
| 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 47.141 |
| 0025 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | EACH | 8 |
| 0026 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | EACH | 2 |
| 0027 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | EACH | 2,075 |
| 0028 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 8 |
| 0030 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | EACH | 1,648 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 2,302 |
| 0032 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | LNFT | 396 |
| 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 569 |
| 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 15.714 |
| 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 7.857 |
| 0036 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | MILE | 0.134 |
| 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 8 |
| 0038 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 2 |
| 0039 | 732-05-00100 | Removal of Existing Markings | MILE | 0.091 |
| 0040 | 739-01-00100 | Hydro-Seeding | ACRE | 0.25 |
| 0041 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0042 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | LNFT | 62,226 |
| 0043 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | LNFT | 24,890 |