Line Number | Item | Description | Unit | Quantity |
| 0001 | 109-01-10000 | Time Related Overhead | LUMP | 1 |
| 0002 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0003 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
| 0004 | 202-02-00030 | Removal of Temporary Tape | LNFT | 58,360 |
| 0005 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 17,266.1 |
| 0006 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 38,766.1 |
| 0007 | 202-02-14500 | Removal of Guard Rail | LNFT | 216 |
| 0008 | 202-02-32180 | Removal of Pipe Headwalls | EACH | 3 |
| 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | SQYD | 21,500 |
| 0010 | 202-02-38220 | Removal of Sign Supports | EACH | 2 |
| 0011 | 202-02-38300 | Removal of Sign and U-Channel Post | EACH | 43 |
| 0012 | 202-02-38360 | Removal of Sign Faces | EACH | 2 |
| 0013 | 202-02-40100 | Removal of Traffic Signal Equipment | LUMP | 1 |
| 0014 | 203-01-00100 | General Excavation | CUYD | 12,918 |
| 0015 | 203-03-00100 | Embankment | CUYD | 22,289 |
| 0016 | 203-04-00200 | Nonplastic Embankment (Sand) | CUYD | 3,152 |
| 0017 | 203-11-00100 | Settlement Plate Installation and Monitoring | EACH | 12 |
| 0018 | 204-04-00100 | Temporary Sediment Basins | EACH | 8 |
| 0019 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 52 |
| 0020 | 204-06-00100 | Temporary Silt Fencing | LNFT | 9,390 |
| 0021 | 302-02-08010 | Class II Base Course (8" Thick) (Soil Cement) | SQYD | 13,636.3 |
| 0022 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | SQYD | 3,097.8 |
| 0023 | 302-02-10010 | Class II Base Course (10" Thick) (Soil Cement) | SQYD | 5,933.5 |
| 0024 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | SQYD | 19,574 |
| 0025 | 502-01-00100 | Asphalt Concrete | TON | 3,357 |
| 0026 | 601-01-00700 | Portland Cement Concrete Pavement (11" Thick) | SQYD | 10,060.6 |
| 0027 | 601-03-01300 | Portland Cement Concrete Shoulder (11" Thick) | SQYD | 6,580.9 |
| 0028 | 601-04-00100 | Portland Cement Concrete Pavement Coring | EACH | 25 |
| 0029 | 701-01-01001 | Cross Drain Pipe (24" RCP) | LNFT | 316 |
| 0030 | 701-03-01110 | Storm Drain Pipe (24" RCP) | LNFT | 36 |
| 0031 | 702-03-00100 | Catch Basins (CB-01) | EACH | 6 |
| 0032 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 1,687.5 |
| 0033 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | LNFT | 19.8 |
| 0034 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 150 |
| 0035 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
| 0036 | 705-06-00400 | Chain Link Fence (7 Foot Height) | LNFT | 320 |
| 0037 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | SQYD | 625.1 |
| 0038 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | SQYD | 542 |
| 0039 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0040 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 1,060 |
| 0041 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | MILE | 0.084 |
| 0042 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | MILE | 11.053 |
| 0043 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | EACH | 2 |
| 0044 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | EACH | 1,622 |
| 0045 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | EACH | 339 |
| 0046 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | EACH | 359 |
| 0047 | 713-11-00100 | Portable Changeable Message Signs | EACH | 2 |
| 0048 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | SQYD | 244 |
| 0049 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | SQYD | 333 |
| 0050 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | SQYD | 162 |
| 0051 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0052 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 1.43 |
| 0053 | 725-01-00100 | Temporary Detour Roads | SQYD | 3,289.7 |
| 0054 | 726-01-00100 | Bedding Material | CUYD | 83.6 |
| 0055 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0056 | 729-01-00100 | Sign (Type A) | SQFT | 53.5 |
| 0057 | 729-04-00100 | Sign (Type D) | SQFT | 77 |
| 0058 | 729-05-00100 | Sign (Type E) | SQFT | 27.5 |
| 0059 | 729-08-00200 | Mounting (3 1/2" Size Post) | EACH | 1 |
| 0060 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | EACH | 2 |
| 0061 | 729-08-00700 | Mounting (W8 x 18 Size Post) | EACH | 2 |
| 0062 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0063 | 729-18-00100 | Milepost Assembly (Structure Mounted) | EACH | 2 |
| 0064 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 813 |
| 0065 | 731-03-00100 | Removal of Raised Pavement Markers | MILE | 2.659 |
| 0066 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 1,466 |
| 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 372 |
| 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 5.318 |
| 0069 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | MILE | 0.136 |
| 0070 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | MILE | 2.659 |
| 0071 | 732-05-00100 | Removal of Existing Markings | MILE | 2.659 |
| 0072 | 739-01-00100 | Hydro-Seeding | ACRE | 13.33 |
| 0073 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0074 | 802-04-00100 | Mechanically Stabilized Earth Wall Concrete Panels | SQFT | 6,506 |
| 0075 | 802-05-00100 | MSEW Structural Excavation and Backfill | LUMP | 1 |
| 0076 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 266 |
| 0077 | 804-01-00400 | Precast Concrete Piles (18") | LNFT | 4,488 |
| 0078 | 804-01-00700 | Precast Concrete Piles (30") | LNFT | 26,790 |
| 0079 | 804-05-00700 | Precast Concrete Test Piles (30") | EACH | 2 |
| 0080 | 804-09-00700 | Static Load Test (Precast Concrete Piles (30")) | EACH | 2 |
| 0081 | 804-14-00100 | Dynamic Monitoring Assistance | EACH | 40 |
| 0082 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
| 0083 | 804-18-00100 | Vibration Monitoring | DAY | 100 |
| 0084 | 805-01-00200 | Class A1 Concrete (Deck) | CUYD | 4,878.12 |
| 0085 | 805-01-00300 | Class A1 Concrete (Bent Cap) | CUYD | 899.86 |
| 0086 | 805-08-01200 | Precast-Prestressed Concrete Girders (Type LG-36) | LNFT | 20,670 |
| 0087 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 55,530 |
| 0088 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 218,658 |
| 0089 | 806-01-00100 | Deformed Reinforcing Steel | LB | 1,582,808 |
| 0090 | 807-01-00100 | Structural Metalwork (Grade 36) | LUMP | 1 |
| 0091 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | LUMP | 1 |
| 0092 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | LNFT | 8,320 |
| 0093 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | SQFT | 6,400 |
| 0094 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | SFIN | 2,072.86 |
| 0095 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | LNFT | 640 |
| 0096 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 29,248 |
| 0097 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 1,216 |
| 0098 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | EACH | 4 |