Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-06140 | Removal of Curbs (Concrete) | LNFT | 25 |
| 0002 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | SQYD | 177 |
| 0003 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching | SQYD | 177 |
| 0004 | 701-14-00100 | Cleaning Existing Pipes | LNFT | 100 |
| 0005 | 701-15-00100 | Concrete Collar | EACH | 1 |
| 0006 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | EACH | 1 |
| 0007 | 707-01-00100 | Concrete Curb | LNFT | 25 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0009 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 0.113 |
| 0010 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 0.113 |
| 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 0.487 |
| 0012 | 713-11-00100 | Portable Changeable Message Signs | EACH | 4 |
| 0013 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0014 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 170 |
| 0015 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 125 |
| 0016 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | LNFT | 358 |
| 0017 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 273 |
| 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.487 |
| 0019 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.012 |
| 0020 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | MILE | 0.113 |
| 0021 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 6 |
| 0022 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | EACH | 6 |
| 0023 | 732-05-00100 | Removal of Existing Markings | MILE | 0.241 |
| 0024 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0025 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 270 |
| 0026 | NS-700-00100 | Trench Drains | EACH | 3 |
| 0027 | NS-701-00124 | Cured In-Place Pipe Lining (24 inches) | LNFT | 68 |
| 0028 | NS-702-00001 | Cleaning Existing Catch Basin | EACH | 1 |
| 0029 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | LNFT | 4 |
| 0030 | 203-01-00100 | General Excavation | CUYD | 6 |
| 0031 | 502-01-00100 | Asphalt Concrete | TON | 73.1 |
| 0032 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 636 |
| 0033 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -35 |
| 0034 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 91 |
| 0035 | 710-01-00100 | Flowable Fill | CUYD | 7 |
| 0036 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 0.017 |
| 0037 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 0.017 |
| 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 0.017 |
| 0039 | 719-04-00100 | Landscaping | LUMP | 1 |
| 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 5 |
| 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.051 |