Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 58 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 432.4 |
| 0003 | 202-02-04560 | Removal of Bridge Joint (Poured Joint Seals) | LNFT | 779 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 122 |
| 0005 | 202-02-14500 | Removal of Guard Rail | LNFT | 1,521.4 |
| 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMPA | LNFT | 124 |
| 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" CMPA, 48" CMPA | LNFT | 230 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 5,226 |
| 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 42 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | LNFT | 2,058 |
| 0011 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | SQYD | 17,464 |
| 0012 | 304-01-00100 | Lime | TON | 123.77 |
| 0013 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | SQYD | 8,733 |
| 0014 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | SQYD | 17,464 |
| 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 1,087 |
| 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 100 |
| 0017 | 502-01-00100 | Asphalt Concrete | TON | 17,700 |
| 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 1,448.2 |
| 0019 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 53,504 |
| 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -4,732 |
| 0021 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 2,828 |
| 0022 | 510-02-00100 | Pavement Widening 18" Minimum Thickness | SQYD | 309.3 |
| 0023 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | LNFT | 256 |
| 0024 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | LNFT | 104 |
| 0025 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | LNFT | 240 |
| 0026 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 443.8 |
| 0027 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 300 |
| 0028 | 704-09-00100 | Guard Rail Anchor Block | EACH | 8 |
| 0029 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 12 |
| 0030 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 105.2 |
| 0031 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 15.872 |
| 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 14.752 |
| 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 36.408 |
| 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 7.787 |
| 0037 | 726-01-00100 | Bedding Material 6" Thick | CUYD | 41.1 |
| 0038 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 16 |
| 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 20 |
| 0041 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | EACH | 942 |
| 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 559 |
| 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 9.102 |
| 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 3.688 |
| 0045 | 732-05-00100 | Removal of Existing Markings | MILE | 0.111 |
| 0046 | 735-01-00100 | Mailboxes | EACH | 21 |
| 0047 | 735-02-00100 | Mailbox Supports (Single) | EACH | 22 |
| 0048 | 739-01-00100 | Hydro-Seeding | ACRE | 0.58 |
| 0049 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0050 | 815-03-00300 | Joint Seal (Poured) | LNFT | 779 |
| 0051 | 830-07-00100 | Structural Concrete Patching | SQFT | 50 |
| 0052 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | SQYD | 38,835 |
| 0053 | NS-830-00900 | Epoxy-Urethane Overlay | SQFT | 11,730 |