Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 32 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 268.4 |
| 0003 | 202-02-14500 | Removal of Guard Rail | LNFT | 181.8 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 100 |
| 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 10 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | LNFT | 400 |
| 0007 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | SQYD | 12,639 |
| 0008 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | SQYD | 12,639 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 387.6 |
| 0010 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 50 |
| 0011 | 502-01-00100 | Asphalt Concrete | TON | 5,043.9 |
| 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 257 |
| 0013 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 15,661 |
| 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -1,884 |
| 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 12.5 |
| 0016 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
| 0017 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 268.4 |
| 0018 | 706-03-00800 | Incidental Concrete Paving (12" Thick) | SQYD | 29.2 |
| 0019 | 706-04-00110 | Curb Ramps TYPE 4 | SQYD | 17.9 |
| 0020 | 707-03-00100 | Combination Concrete Curb and Gutter | LNFT | 153.5 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 2.349 |
| 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 1.209 |
| 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 8.916 |
| 0025 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | EACH | 1 |
| 0026 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | EACH | 1 |
| 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | EACH | 1 |
| 0028 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | EACH | 1 |
| 0029 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 1.657 |
| 0031 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 14 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 156 |
| 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 205 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 3.195 |
| 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.404 |
| 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 1 |
| 0039 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 1 |
| 0040 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | EACH | 2 |
| 0041 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 1 |
| 0042 | 739-01-00100 | Hydro-Seeding | ACRE | 0.654 |
| 0043 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0044 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 1,216 |