Line Number | Item | Description | Unit | Quantity |
| 0001 | 502-01-00100 | Asphalt Concrete | TON | 2,260 |
| 0002 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 19,903 |
| 0003 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -834 |
| 0004 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 5 |
| 0005 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | LNFT | 11,178 |
| 0006 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | LNFT | 25,439 |
| 0007 | 602-03-00100 | Cleaning and Sealing Random Cracks | LNFT | 3,662 |
| 0008 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | SQYD | 5,315 |
| 0009 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | SQYD | 886 |
| 0010 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | SQYD | 936 |
| 0011 | 602-10-00100 | Longitudinal Shoulder Joints | LNFT | 22,356 |
| 0012 | 707-01-00100 | Concrete Curb | LNFT | 400 |
| 0013 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 2.121 |
| 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 6.6 |
| 0016 | 713-11-00100 | Portable Changeable Message Signs | EACH | 2 |
| 0017 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 707 |
| 0019 | 731-03-00100 | Removal of Raised Pavement Markers | MILE | 2.121 |
| 0020 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 160 |
| 0021 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 96 |
| 0022 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 6.6 |
| 0023 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 2.121 |
| 0024 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 2 |
| 0025 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | EACH | 2 |
| 0026 | 732-05-00100 | Removal of Existing Markings | MILE | 6.613 |
| 0027 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0028 | NS-300-01000 | High-Density Polyurethane Foam 209,069 LB | SQYD | 29,867 |