Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 396 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 166.9 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | LNFT | 1,765 |
| 0005 | 202-02-14500 | Removal of Guard Rail | LNFT | 1,120 |
| 0006 | 203-01-00100 | General Excavation | CUYD | 37 |
| 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 780 |
| 0008 | 502-01-00100 | Asphalt Concrete | TON | 26 |
| 0009 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 473 |
| 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -10 |
| 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 35.5 |
| 0012 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | SQYD | 253.6 |
| 0013 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | LNFT | 13,258 |
| 0014 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | LNFT | 12,044 |
| 0015 | 602-03-00100 | Cleaning and Sealing Random Cracks | LNFT | 1,078 |
| 0016 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | SQYD | 257.1 |
| 0017 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | SQYD | 958.7 |
| 0018 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | SQYD | 1,326.6 |
| 0019 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | LNFT | 904 |
| 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 706.3 |
| 0021 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | LNFT | 10.8 |
| 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 200 |
| 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 7 |
| 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 2 |
| 0025 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 166.9 |
| 0026 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | SQYD | 244 |
| 0027 | 707-01-00100 | Concrete Curb | LNFT | 1,670 |
| 0028 | 707-04-00100 | Asphalt Curb | LNFT | 108 |
| 0029 | 710-01-00100 | Flowable Fill | CUYD | 5 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0031 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 486 |
| 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 957 |
| 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 3.906 |
| 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 4.978 |
| 0035 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | EACH | 3 |
| 0036 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | EACH | 2 |
| 0037 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | EACH | 3 |
| 0038 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | EACH | 4 |
| 0039 | 713-11-00100 | Portable Changeable Message Signs | EACH | 6 |
| 0040 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 9 |
| 0042 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | EACH | 40 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,300 |
| 0044 | 732-01-03080 | Plastic Pavement Striping (24" Width) (Preformed Tape) (DOTD Intersection Grade) | LNFT | 957 |
| 0045 | 732-02-03000 | Plastic Pavement Striping (Solid Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | MILE | 4.978 |
| 0046 | 732-02-03040 | Plastic Pavement Striping (Solid Line) (8" Width) (Preformed Tape) (Retroreflectivity Level I) | MILE | 0.057 |
| 0047 | 732-03-03000 | Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | MILE | 1.309 |
| 0048 | 732-03-03030 | Plastic Pavement Striping (Dotted Line) (8" Width)(3' Length)(Preformed Tape) (Retroreflectivity Level I) | MILE | 0.035 |
| 0049 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | EACH | 3 |
| 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 2 |
| 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 3 |
| 0052 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 4 |
| 0053 | 732-05-00100 | Removal of Existing Markings | MILE | 1.295 |
| 0054 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0055 | 830-07-00100 | Structural Concrete Patching | SQFT | 18 |
| 0056 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | INLF | 170.3 |
| 0057 | NS-602-00001 | Milling Concrete Pavement | SQYD | 1,293.8 |
| 0058 | NS-602-00011 | Expansion Joint Rehabilitation | LNFT | 564 |
| 0059 | NS-702-00001 | Cleaning Existing Catch Basin | EACH | 5 |