Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 34 |
| 0003 | 202-02-12020 | Removal of Fence (Chain Link) | LNFT | 83 |
| 0004 | 204-06-00100 | Temporary Silt Fencing | LNFT | 862 |
| 0005 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 67 |
| 0006 | 602-03-00100 | Cleaning and Sealing Random Cracks | LNFT | 20 |
| 0007 | 705-06-00400 | Chain Link Fence (7 Foot Height) | LNFT | 127 |
| 0008 | 706-02-00300 | Concrete Drive (8" Thick) | SQYD | 43 |
| 0009 | 711-03-00400 | Riprap (55 lb) | TON | 908.6 |
| 0010 | 711-04-00100 | Geotextile Fabric | SQYD | 1,284 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0012 | 717-01-00100 | Seeding | LB | 10 |
| 0013 | 718-01-00100 | Fertilizer | LB | 245 |
| 0014 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0015 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0016 | TS-817-00001 | Initial Installation, Maintenance, and Final Removal of Temporary Dams | LUMP | 1 |
| 0017 | TS-817-00002 | Temporary Dam Removal and Replacement | EACH | 1 |