Search


Proposal H.000382.6 Item Summary
Scheduled for Letting 06/26/2024  
   
US 71: BRIDGES NEAR ST. MAURICE
SPECIAL NOTICE TO CONTRACTORS: The Build America Buy America ("BABA") provisions of the Infrastructure Investment and Jobs Act (“IIJA”) as defined in PL 117-58, enacted on November 15, 2021, apply to this project. SPECIAL NOTICE TO CONTRACTORS: Transparent stay in place forms, as outlined in 805.03.5, are required for bridge sites at Little Natchez Bayou & Saline Bayou.


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
Line
Number
ItemDescriptionUnitQuantity
0001201-01-00100Clearing and Grubbing LUMP1
0002202-02-02000Removal of Asphalt Drives SQYD330
0003202-02-03030Removal of Pavement Structure SQYD20,741.9
0004202-02-04501Removal of Bridge (STA. 108+35.7 33.5FT X 201FT CONCRETE DECK STEEL GIRDER BRIDGE)LUMP1
0005202-02-04501Removal of Bridge (STA. 122+47.4 OFFSET LT 66.6 FT 30.8 FT X 281 FT CONCRETE DECK GIRDER BRIDGELUMP1
0006202-02-04501Removal of Bridge (STA. 177+25.1 33.5 FT X 80 FT CONCRETE SLAB BRIDGELUMP1
0007202-02-14500Removal of Guard Rail LNFT2,528.3
0008203-01-00100General Excavation CUYD16,013
0009203-01-00100General Excavation (LEVEE SECTION)CUYD388
0010203-02-00100Drainage Excavation CUYD2,979
0011203-03-00100Embankment CUYD46,446
0012203-03-00100Embankment (LEVEE SECTION)CUYD5,847
0013203-11-00100Settlement Plate Installation and Monitoring EACH7
0014204-05-00100Temporary Sediment Check Dams (Hay) EACH117
0015204-06-00100Temporary Silt Fencing LNFT6,055
0016302-02-08570Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) SQYD19,605.9
0017304-01-00100Lime TON179.41
0018304-05-00100Lime Treatment (Type E) SQYD12,656.6
0019401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) CUYD91
0020402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) CUYD650
0021502-01-00100Asphalt Concrete TON4,946.2
0022502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON587.9
0023510-01-00250Pavement Patching (14 inch Minimum Thickness) SQYD1,030
0024701-01-01001Cross Drain Pipe (24" RCP) LNFT96
0025701-01-01041Cross Drain Pipe (36" RCP) LNFT184
0026701-05-01049Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW) LNFT320
0027701-05-01068Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) LNFT136
0028701-05-01105Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) LNFT144
0029704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT831.3
0030704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT300
0031704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) EACH12
0032705-01-00100Barbed Wire Fence LNFT4,580
0033705-02-00100Combination Mesh & Barbed Wire Fence LNFT595
0034705-05-00100Double Swinging Driveway Gates DBGT5
0035708-01-00100Right-of-Way Monument EACH21
0036708-02-00100Right-of-Way Monument Witness Post EACH21
0037712-04-00100Flexible Revetment SQYD7,218
0038713-01-00100Temporary Signs and Barricades LUMP1
0039713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) MILE3.15
0040713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) MILE2.558
0041713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) MILE9.836
0042713-07-00100Temporary Precast Concrete Barrier (Contractor Furnished) EACH211
0043713-10-00100Temporary Precast Concrete Barrier Movement EACH194
0044716-01-00100Mulch (Vegetative) TON30
0045717-01-00100Seeding LB1,600
0046718-01-00100Fertilizer LB20,000
0047720-01-01000Erosion Control System (Slope Protection) (Type A) SQYD3,884
0048720-01-02000Erosion Control System, Flexible (Channel Liner) (Type C) SQYD292
0049720-01-02020Erosion Control System, Flexible (Channel Liner) (Type D) SQYD1,735
0050720-01-02040Erosion Control System, Flexible (Channel Liner) (Type E) SQYD542
0051722-02-00100Project Site Laboratory (Equipped) EACH1
0052724-01-00100Rumble Strips (Centerline) MILE0.35
0053724-01-00100Rumble Strips (Centerline) MILE0.965
0054725-01-00100Temporary Detour Roads SQYD14,289.3
0055726-01-00100Bedding Material CUYD66.4
0056727-01-00100Mobilization LUMP1
0057729-16-00200Object Marker Assembly (Type 2) EACH6
0058729-16-00300Object Marker Assembly (Type 3) EACH12
0059731-02-00100Reflectorized Raised Pavement Markers EACH213
0060732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE3.354
0061732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) MILE0.387
0062735-01-00100Mailboxes EACH2
0063735-02-00100Mailbox Supports (Single) EACH2
0064740-01-00100Construction Layout LUMP1
0065803-01-00200Drilled Shaft (24" Diameter) LNFT136
0066803-01-00500Drilled Shaft (42" Diameter) LNFT600
0067803-01-00800Drilled Shaft (60" Diameter) LNFT1,023
0068803-02-00800Test Shaft (60" Diameter) LNFT94
0069803-07-00800Bi-Directional Load Cell Test (60" Diameter) EACH1
0070803-08-00500Crosshole Sonic Log Test (42" Diameter) EACH6
0071803-08-00800Crosshole Sonic Log Test (60" Diameter) EACH13
0072803-10-00800Permanent Casing (60" Diameter) LNFT545
0073803-11-00510Thermal Integrity Profiling (42” Diameter) EACH6
0074803-11-00810Thermal Integrity Profiling (60” Diameter) EACH13
0075804-01-00600Precast Concrete Piles (24") LNFT5,060
0076804-10-00600Precast Concrete Indicator Piles (24") EACH1
0077804-14-00100Dynamic Monitoring Assistance EACH7
0078804-17-00100Construction Site Survey LUMP1
0079804-18-00100Vibration Monitoring DAY8
0080805-01-00100Class A1 Concrete (Slab Span) CUYD277.48
0081805-01-00200Class A1 Concrete (Deck) (With Transparent Stay-In-Place Forms)CUYD936.93
0082805-01-00300Class A1 Concrete (Bent Cap) CUYD357.9
0083805-01-00400Class A1 Concrete (Column) CUYD61.21
0084805-01-01000Class A1 Concrete (Headwalls) (6.08 cu yds per headwall)CUYD12.16
0085805-04-00100Class MASS(A1) Concrete (Bent Cap) CUYD106.92
0086805-08-01100Precast-Prestressed Concrete Girders (Type LG-25) LNFT1,422
0087805-08-01400Precast-Prestressed Concrete Girders (Type LG-54) LNFT2,488
0088805-18-00100Concrete Finish (Class 2 Rubbed Finish) SQFT12,910
0089805-18-00200Concrete Finish (Class 3 Special Finish) SQFT12,910
0090806-01-00100Deformed Reinforcing Steel LB381,350
0091807-01-00100Structural Metalwork (Grade 36) LUMP1
0092810-01-00120Concrete Bridge Railing (36 inch Height) LNFT1,904
0093813-01-00100Concrete Approach Slabs (Cast-in-Place) SQFT9,600
0094814-01-00100Elastomeric Bearing Pads (Non-Reinforced) SFIN217
0095814-02-00100Elastomeric Bearing Pads (Reinforced) SFIN694
0096815-02-00100Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) LNFT240
0097815-03-00300Joint Seal (Poured) LNFT320
0098816-02-00100Bridge End Drain System (Open Drain) EACH5
0099817-01-00100Temporary Detour Bridge (Concrete) SQFT6,400
0100NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay LNFT720
0101NS-500-00260Sawcuts in Asphalt Concrete Lifts LNFT1,200
0102NS-500-00340Saw Cutting Asphalt Concrete Pavement INLF2,418
0103NS-500-00360Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement INLF600
0104NS-700-00810Impact Attenuator (Construction Zone)(Test Level 3) EACH24
0105202-02-12000Removal of Fence LNFT5,058
0106202-02-32100Removal of Pipe (Cross Drain) (24" RCP)LNFT92
0107202-02-32120Removal of Pipe (Side Drain) (15" RCP AT STA. 129+00, Rt.)LNFT175
0108202-02-32120Removal of Pipe (Side Drain) (12" CMP)LNFT28
0109202-02-32120Removal of Pipe (Side Drain) (12" SP)LNFT28
0110202-02-32120Removal of Pipe (Side Drain) (18" CMP)LNFT20
0111202-02-32120Removal of Pipe (Side Drain) (24" EQUIV. CMPA)LNFT24
0112202-02-32120Removal of Pipe (Side Drain) (18" RCP)LNFT20
0113202-02-32120Removal of Pipe (Side Drain) (24" RCP)LNFT64