Scheduled for Letting 06/12/2024  
   
LA 3125: LA 70 - LA 3213
5/21/2024 - Added to the letting of June 12, 2024. SPECIAL NOTICE TO CONTRACTORS: The Build America Buy America ("BABA") provisions of the Infrastructure Investment and Jobs Act ("IIJA") as defined in PL 117-58, enacted on November 15, 2021, apply to this project.


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
Line
Number
ItemDescriptionUnitQuantity
0001201-01-00100Clearing and Grubbing LUMP1
0002202-02-02020Removal of Asphalt Pavement SQYD1,443.3
0003202-02-14500Removal of Guard Rail LNFT819
0004203-01-00100General Excavation CUYD49
0005203-07-00100Borrow (Vehicular Measurement) CUYD500
0006204-06-00100Temporary Silt Fencing LNFT1,796
0007302-02-06030Class II Base Course (6" Thick) (Asphalt Concrete Base) SQYD291.5
0008402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) CUYD48.6
0009502-01-00100Asphalt Concrete TON46,028.4
0010502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON1,041.9
0011509-01-00100Milling Asphalt Pavement SQYD327,466
0012509-02-00100Contractor Retained Reclaimed Asphalt Pavement CUYD-13,762
0013510-01-00100Pavement Patching (6" Minimum Thickness) SQYD14,425
0014510-01-00200Pavement Patching (12" Minimum Thickness) SQYD18,165
0015704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT275
0016704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT200
0017704-10-00120Guard Rail End Treatment, MASH, (TL-3 Flared) EACH7
0018704-10-00204Guard Rail End Treatment, MASH, (TL-2 Tangent) EACH1
0019713-01-00100Temporary Signs and Barricades LUMP1
0020713-02-00300Temporary Pavement Markings (8" Width) LNFT3,132
0021713-02-00500Temporary Pavement Markings (24" Width) LNFT2,449
0022713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) MILE24.734
0023713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) MILE24.734
0024713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) MILE68.215
0025713-05-00220Temporary Pavement Legends & Symbols (Arrow - Left Turn) EACH17
0026713-05-00230Temporary Pavement Legends & Symbols (Arrow - Right Turn) EACH17
0027713-05-00240Temporary Pavement Legends & Symbols (Arrow - Merge) EACH4
0028713-05-00400Temporary Pavement Legends & Symbols (RR Crossing) EACH6
0029724-01-00100Rumble Strips (Centerline) MILE10.38
0030724-02-00100Rumble Strips (Shoulder/Edge) MILE22.492
0031727-01-00100Mobilization LUMP1
0032729-16-00300Object Marker Assembly (Type 3) EACH8
0033731-02-00100Reflectorized Raised Pavement Markers EACH3,285
0034732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) LNFT2,017
0035732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) LNFT144
0036732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE30.359
0037732-02-02040Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) MILE0.243
0038732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) MILE11.02
0039732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) MILE0.156
0040732-03-02040Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) MILE0.126
0041732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) EACH6
0042732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) EACH6
0043732-04-01120Plastic Pavement Legends and Symbols (Arrow - Merge) EACH2
0044732-04-18000Plastic Pavement Legends and Symbols (RR Crossing) EACH2
0045739-01-00100Hydro-Seeding ACRE1.89
0046740-01-00100Construction Layout LUMP1
0047NS-500-00340Saw Cutting Asphalt Concrete Pavement INLF7,860
0048NS-701-00020Culvert Rehabilitation by Geopolymer Lining LNFT3,608