Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-14500 | Removal of Guard Rail | LNFT | 346 |
| 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) (18" CMP) | LNFT | 40 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 150 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 562 |
| 0005 | 502-01-00100 | Asphalt Concrete | TON | 5,967.1 |
| 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 242.6 |
| 0007 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 27,470 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -832 |
| 0009 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | SQYD | 372 |
| 0010 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | LNFT | 40 |
| 0011 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 40 |
| 0012 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | LNFT | 200 |
| 0013 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 25 |
| 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
| 0015 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 4 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 6.785 |
| 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 3.341 |
| 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 23.021 |
| 0020 | 726-01-00100 | Bedding Material | CUYD | 8.8 |
| 0021 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0022 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 2 |
| 0023 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 460 |
| 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 12 |
| 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 7.83 |
| 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 1.114 |
| 0028 | 732-05-00100 | Removal of Existing Markings | MILE | 0.039 |
| 0029 | 735-01-00100 | Mailboxes | EACH | 5 |
| 0030 | 735-02-00100 | Mailbox Supports (Single) | EACH | 5 |
| 0031 | 739-01-00100 | Hydro-Seeding | ACRE | 3.29 |
| 0032 | 740-01-00100 | Construction Layout | LUMP | 1 |