Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) APPROX. 0.933 ACRES | LUMP | 1 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 509 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 366 |
| 0004 | 502-01-00100 | Asphalt Concrete | TON | 2,871.5 |
| 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 516.1 |
| 0006 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 1,754 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -37 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 1,650 |
| 0009 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0010 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 2.558 |
| 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 10.232 |
| 0012 | 716-01-00100 | Mulch (Vegetative) | TON | 1.9 |
| 0013 | 717-01-00100 | Seeding | LB | 56 |
| 0014 | 718-01-00100 | Fertilizer | LB | 930 |
| 0015 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0016 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 4 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 338 |
| 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 5.116 |
| 0019 | 735-01-00100 | Mailboxes | EACH | 48 |
| 0020 | 735-02-00100 | Mailbox Supports (Single) | EACH | 32 |
| 0021 | 735-03-00100 | Mailbox Supports (Double) | EACH | 8 |
| 0022 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0023 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 1,203 |