Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 23 |
| 0004 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 262.4 |
| 0005 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 262.4 |
| 0006 | 202-02-04501 | Removal of Bridge (STA. 50+00, 40' W x 96' L Timber Supported Concrete Slab Span, w/ curb and sidewalks) | LUMP | 1 |
| 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 53.94 |
| 0008 | 203-02-00100 | Drainage Excavation | CUYD | 496 |
| 0009 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0010 | 204-03-00100 | Temporary Slope Drains | LNFT | 60 |
| 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 4 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | LNFT | 522 |
| 0013 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | SQYD | 589.6 |
| 0014 | 305-01-01040 | Subgrade Layer (6" Thick) (Stone) | SQYD | 589.6 |
| 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 50 |
| 0016 | 502-01-00100 | Asphalt Concrete | TON | 94.1 |
| 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 7 |
| 0018 | 705-06-00300 | Chain Link Fence (6-Foot Height) | LNFT | 65.4 |
| 0019 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 168 |
| 0020 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 47.8 |
| 0021 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | SQYD | 79.2 |
| 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | LNFT | 302.1 |
| 0023 | 711-04-00100 | Geotextile Fabric | SQYD | 375 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0025 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | EACH | 4 |
| 0026 | 716-01-00100 | Mulch (Vegetative) | TON | 0.4 |
| 0027 | 717-01-00100 | Seeding | LB | 6 |
| 0028 | 718-01-00100 | Fertilizer | LB | 200 |
| 0029 | 726-01-00100 | Bedding Material | CUYD | 500 |
| 0030 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 11 |
| 0033 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | LNFT | 543 |
| 0034 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0035 | 805-15-02000 | Reinforced Concrete Box Culverts (Precast) (10' x 7') | LNFT | 150 |
| 0036 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (3-10' x 7' Openings) | EACH | 2 |
| 0037 | 807-01-00200 | Structural Metalwork (Grade 50) (200 ibs.) | LUMP | 1 |
| 0038 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 959 |
| 0039 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 824.2 |
| 0040 | NS-713-00009 | Portable Changeable Message Sign (with communications) | EACH | 4 |