Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-14500 | Removal of Guard Rail | LNFT | 200 |
| 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" CMP) | LNFT | 33 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) | LNFT | 4 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 725 |
| 0005 | 303-02-00100 | Removal of Existing Patches | SQYD | 300 |
| 0006 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | SQYD | 13,227.7 |
| 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 2,607 |
| 0008 | 502-01-00100 | Asphalt Concrete | TON | 14,976.7 |
| 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 1,329.3 |
| 0010 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 73,281 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -1,373 |
| 0012 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | SQYD | 154 |
| 0013 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | SQYD | 56 |
| 0014 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | SQYD | 155.6 |
| 0015 | 701-01-01001 | Cross Drain Pipe (24" RCP) | LNFT | 8 |
| 0016 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | LNFT | 40 |
| 0017 | 701-15-00100 | Concrete Collar | EACH | 1 |
| 0018 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 33 |
| 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 87.5 |
| 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
| 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
| 0022 | 707-04-00100 | Asphalt Curb | LNFT | 54 |
| 0023 | 711-01-04020 | Riprap (55 lb, 24" Thick) | SQYD | 5 |
| 0024 | 711-04-00100 | Geotextile Fabric | SQYD | 5 |
| 0025 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 21.087 |
| 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 8.743 |
| 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 36.261 |
| 0029 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0030 | 726-01-00100 | Bedding Material | CUYD | 11 |
| 0031 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 3 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0034 | 729-19-00100 | Dead End Road Installations (Type A) | EACH | 4 |
| 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,459 |
| 0036 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | LNFT | 50 |
| 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 66 |
| 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 12.088 |
| 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 2.915 |
| 0040 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 2 |
| 0041 | 732-05-00100 | Removal of Existing Markings | MILE | 0.011 |
| 0042 | 735-01-00100 | Mailboxes | EACH | 49 |
| 0043 | 735-02-00100 | Mailbox Supports (Single) | EACH | 45 |
| 0044 | 735-03-00100 | Mailbox Supports (Double) | EACH | 2 |
| 0045 | 739-01-00100 | Hydro-Seeding | ACRE | 10.02 |
| 0046 | 740-01-00100 | Construction Layout | LUMP | 1 |