Line Number | Item | Description | Unit | Quantity |
| 0001 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | GAL | 198,583 |
| 0002 | 507-02-00300 | Aggregate (S3) | SQYD | 640,597 |
| 0003 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0004 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 25 |
| 0005 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 13.283 |
| 0006 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 166.671 |
| 0007 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | EACH | 12,178 |
| 0008 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 25.182 |
| 0009 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 88.983 |
| 0010 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 10,424 |
| 0012 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 25 |
| 0013 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | MILE | 333.406 |
| 0014 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | MILE | 26.566 |
| 0015 | 740-01-00100 | Construction Layout | LUMP | 1 |