0001202-02-02000Removal of Asphalt Drives SQYD560
0002202-02-06090Removal of Concrete Revetment LUMP1
0003202-02-06100Removal of Concrete Walks and Drives SQYD54
0004202-02-14500Removal of Guard Rail LNFT300
0005203-07-00100Borrow (Vehicular Measurement) CUYD1,400
0006204-05-00100Temporary Sediment Check Dams (Hay) EACH54
0007303-01-00200In-Place Cement Stabilized Base Course (8-1/2" Thick) SQYD148,409
0008305-01-03020Subgrade Layer (10" Thick) (Treated) SQYD73,664
0009401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) CUYD2,976
0010402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) CUYD200
0011502-01-00100Asphalt Concrete TON38,735.1
0012502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON1,224.2
0013509-01-00100Milling Asphalt Pavement SQYD119,509
0014509-02-00100Contractor Retained Reclaimed Asphalt Pavement CUYD-8,663
0015510-01-00104Pavement Patching (10" Minimum Thickness) SQYD58
0016602-12-00100Undersealing Pavement TON2
0017602-14-00100Holes EACH8
0018704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT300
0019704-06-00200Guard Rail Bridge Attachments (Single Thrie Beam) LNFT50
0020704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT100
0021704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) EACH4
0022706-02-00200Concrete Drive (6" Thick) SQYD54
0023707-04-00100Asphalt Curb LNFT54
0024712-02-00100Sacked Concrete Revetment SQYD500
0025713-01-00100Temporary Signs and Barricades LUMP1
0026713-02-00100Temporary Pavement Markings (4" Width) LNFT81
0027713-02-00300Temporary Pavement Markings (8" Width) LNFT207
0028713-02-00500Temporary Pavement Markings (24" Width) LNFT426
0029713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) MILE27.507
0030713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) MILE23.262
0031713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) MILE76.914
0032722-02-00100Project Site Laboratory (Equipped) EACH1
0033724-01-00100Rumble Strips (Centerline) MILE9.132
0034724-02-00100Rumble Strips (Shoulder/Edge) MILE18.264
0035727-01-00100Mobilization LUMP1
0036729-16-00300Object Marker Assembly (Type 3) EACH104
0037731-02-00100Reflectorized Raised Pavement Markers EACH1,593
0038732-01-02000Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) LNFT27
0039732-01-02040Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) LNFT69
0040732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) LNFT142
0041732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE25.638
0042732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) MILE7.754
0043732-05-00100Removal of Existing Markings MILE0.042
0044735-01-00100Mailboxes EACH50
0045735-02-00100Mailbox Supports (Single) EACH50
0046740-01-00100Construction Layout LUMP1
0047815-03-00300Joint Seal (Poured) LNFT264
0048NS-600-00220Saw Cutting Portland Cement Concrete Pavement INLF250