Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 560 |
| 0002 | 202-02-06090 | Removal of Concrete Revetment | LUMP | 1 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 54 |
| 0004 | 202-02-14500 | Removal of Guard Rail | LNFT | 300 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 1,400 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 54 |
| 0007 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | SQYD | 148,409 |
| 0008 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | SQYD | 73,664 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 2,976 |
| 0010 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 200 |
| 0011 | 502-01-00100 | Asphalt Concrete | TON | 38,735.1 |
| 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 1,224.2 |
| 0013 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 119,509 |
| 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -8,663 |
| 0015 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | SQYD | 58 |
| 0016 | 602-12-00100 | Undersealing Pavement | TON | 2 |
| 0017 | 602-14-00100 | Holes | EACH | 8 |
| 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 300 |
| 0019 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | LNFT | 50 |
| 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
| 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
| 0022 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 54 |
| 0023 | 707-04-00100 | Asphalt Curb | LNFT | 54 |
| 0024 | 712-02-00100 | Sacked Concrete Revetment | SQYD | 500 |
| 0025 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0026 | 713-02-00100 | Temporary Pavement Markings (4" Width) | LNFT | 81 |
| 0027 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 207 |
| 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 426 |
| 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 27.507 |
| 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 23.262 |
| 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 76.914 |
| 0032 | 722-02-00100 | Project Site Laboratory (Equipped) | EACH | 1 |
| 0033 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 9.132 |
| 0034 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 18.264 |
| 0035 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 104 |
| 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,593 |
| 0038 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | LNFT | 27 |
| 0039 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | LNFT | 69 |
| 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 142 |
| 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 25.638 |
| 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 7.754 |
| 0043 | 732-05-00100 | Removal of Existing Markings | MILE | 0.042 |
| 0044 | 735-01-00100 | Mailboxes | EACH | 50 |
| 0045 | 735-02-00100 | Mailbox Supports (Single) | EACH | 50 |
| 0046 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0047 | 815-03-00300 | Joint Seal (Poured) | LNFT | 264 |
| 0048 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 250 |