Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 10 |
| 0002 | 202-02-03030 | Removal of Pavement Structure | SQYD | 3,728.6 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 554 |
| 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" Metal Round, 18" CMP Round, 27" Metal Round | LNFT | 125 |
| 0005 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" Round pipe | LNFT | 42 |
| 0006 | 203-01-00100 | General Excavation | CUYD | 63 |
| 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 60 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 17 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | LNFT | 2,790 |
| 0010 | 302-02-08080 | Class II Base Course (8" Thick) (Asphalt Concrete Base) | SQYD | 3,728.6 |
| 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 5 |
| 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 18.3 |
| 0013 | 502-01-00100 | Asphalt Concrete | TON | 2,267 |
| 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 229.1 |
| 0015 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 4,112 |
| 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -546 |
| 0017 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | SQYD | 263 |
| 0018 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | LNFT | 3,258 |
| 0019 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | LNFT | 1,440 |
| 0020 | 602-03-00100 | Cleaning and Sealing Random Cracks | LNFT | 470 |
| 0021 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | LNFT | 78 |
| 0022 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | LNFT | 42 |
| 0023 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | LNFT | 42 |
| 0024 | 701-15-00100 | Concrete Collar | EACH | 1 |
| 0025 | 706-01-00300 | Concrete Walk (6" Thick) | SQYD | 4.8 |
| 0026 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 613.4 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 11 |
| 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 0.499 |
| 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 0.499 |
| 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 1.028 |
| 0032 | 716-01-00100 | Mulch (Vegetative) | TON | 0.2 |
| 0033 | 717-01-00100 | Seeding | LB | 4 |
| 0034 | 718-01-00100 | Fertilizer | LB | 107 |
| 0035 | 726-01-00100 | Bedding Material | CUYD | 31.1 |
| 0036 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 67 |
| 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 11 |
| 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 1.028 |
| 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.499 |
| 0041 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0042 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | LNFT | 3,258 |
| 0043 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | LNFT | 1,440 |
| 0044 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | LNFT | 14,094 |
| 0045 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 995 |
| 0046 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 5,862 |