Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
| 0002 | 202-02-14500 | Removal of Guard Rail | LNFT | 640 |
| 0003 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | LNFT | 640 |
| 0004 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0005 | 713-11-00100 | Portable Changeable Message Signs | EACH | 5 |
| 0006 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0007 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0008 | 804-03-00600 | Steel Piles (HP 12x74) | LNFT | 480 |
| 0009 | 807-01-00200 | Structural Metalwork (Grade 50) (ESTIMATED QTY = 40,986 LBS) | LUMP | 1 |
| 0010 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | SFIN | 17 |
| 0011 | 815-03-00200 | Joint Seal (Preformed Silicone) | LNFT | 60 |
| 0012 | 830-01-00100 | Bridge Superstructure Repair (Base Plate Replacement) | EACH | 6 |
| 0013 | 830-01-00100 | Bridge Superstructure Repair (Shim Replacement) | EACH | 12 |
| 0014 | 830-09-00100 | Structure Jacking | LUMP | 1 |