Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | LNFT | 22 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 70 |
| 0003 | 202-02-06102 | Removal of Incidental Concrete Paving | SQYD | 309 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | LNFT | 115 |
| 0005 | 202-02-14500 | Removal of Guard Rail | LNFT | 64 |
| 0006 | 202-02-38200 | Removal of Signs | EACH | 19 |
| 0007 | 202-02-38300 | Removal of Sign and U-Channel Post | EACH | 14 |
| 0008 | 202-03-38020 | Relocation of Sign Pole Including signs | EACH | 2 |
| 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 40 |
| 0010 | 502-01-00100 | Asphalt Concrete | TON | 5,367.6 |
| 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 350.2 |
| 0012 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 50,271 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -2,094 |
| 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 445 |
| 0015 | 602-10-00100 | Longitudinal Shoulder Joints | LNFT | 31,114 |
| 0016 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | EACH | 1 |
| 0017 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | EACH | 5 |
| 0018 | 702-04-00200 | Adjusting Catch Basins | EACH | 14 |
| 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 68.8 |
| 0020 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | LNFT | 9.9 |
| 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 1 |
| 0022 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 73.1 |
| 0023 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | SQYD | 309.4 |
| 0024 | 706-04-00100 | Handicapped Curb Ramps TYPE 2 | EACH | 11 |
| 0025 | 706-04-00100 | Handicapped Curb Ramps TYPE 7 | EACH | 1 |
| 0026 | 707-01-00100 | Concrete Curb | LNFT | 113.5 |
| 0027 | 707-03-00100 | Combination Concrete Curb and Gutter | LNFT | 33 |
| 0028 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0029 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 1,566 |
| 0030 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 116 |
| 0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 5.874 |
| 0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 3.892 |
| 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 14.938 |
| 0034 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | EACH | 4 |
| 0035 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | EACH | 12 |
| 0036 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | EACH | 6 |
| 0037 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | EACH | 6 |
| 0038 | 717-01-00100 | Seeding | LB | 4 |
| 0039 | 718-01-00100 | Fertilizer | LB | 11 |
| 0040 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 20 |
| 0042 | 729-19-00300 | Dead End Road Installations (Type C) | EACH | 3 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,250 |
| 0044 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 590 |
| 0045 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | LNFT | 193 |
| 0046 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 58 |
| 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 7.469 |
| 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 1.946 |
| 0049 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.082 |
| 0050 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | EACH | 2 |
| 0051 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 6 |
| 0052 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 3 |
| 0053 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | EACH | 3 |
| 0054 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL ZONE) | EACH | 2 |
| 0055 | 735-01-00100 | Mailboxes | EACH | 4 |
| 0056 | 735-02-00100 | Mailbox Supports (Single) | EACH | 4 |
| 0057 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0058 | 741-11-00200 | Adjusting Water Valve and Meter Box | EACH | 5 |
| 0059 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | LNFT | 15,557 |
| 0060 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | LNFT | 24,891 |
| 0061 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | LNFT | 40,448 |
| 0062 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 2,756 |
| 0063 | NS-719-00002 | Tree Trimming | LUMP | 1 |