Proposal H.010724.6 Item Summary
Scheduled for Letting 12/08/2021  
   
PECAN ISLAND ROAD OVER THE CHENAL


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
Line
Number
ItemDescriptionUnitQuantity
0001201-01-00100Clearing and Grubbing LUMP1
0002202-01-00100Removal of Structures and Obstructions LUMP1
0003202-02-02020Removal of Asphalt Pavement SQYD612.7
0004202-02-03010Removal of Base – Recycled PCC or Stone SQYD612.7
0005202-02-04501Removal of Bridge Bridge (Bridge Sta. 101+73.53 - 14' x 143' Timber Bridge with Timber Piles)LUMP1
0006202-02-12000Removal of Fence LNFT24
0007203-02-00100Drainage Excavation CUYD35
0008203-04-00200Nonplastic Embankment (Sand) CUYD44
0009203-04-00300Nonplastic Embankment (Stone) CUYD36
0010203-05-00100Excavation and Embankment LUMP1
0011204-02-00100Temporary Hay Bales EACH10
0012204-06-00100Temporary Silt Fencing LNFT791
0013302-01-00300Class II Base Course (Crushed Stone) CUYD227.3
0014401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) CUYD6.4
0015402-01-00100Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) CUYD50
0016402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) CUYD25
0017502-01-00100Asphalt Concrete TON125.6
0018502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON17.5
0019704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT25
0020704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT50
0021704-10-00105Guard Rail End Treatment (Flared, 12' - 6" Length) EACH2
0022706-03-00100Incidental Concrete Paving (4" Thick) SQYD10.4
0023711-01-03000Riprap (30 lb, 14" Thick) SQYD235
0024711-04-00100Geotextile Fabric SQYD235
0025713-01-00100Temporary Signs and Barricades LUMP1
0026716-01-00100Mulch (Vegetative) TON0.6
0027717-01-00100Seeding LB11
0028718-01-00100Fertilizer LB335
0029726-01-00100Bedding Material CUYD33.4
0030727-01-00100Mobilization LUMP1
0031729-16-00300Object Marker Assembly (Type 3) EACH4
0032735-01-00100Mailboxes EACH1
0033735-02-00100Mailbox Supports (Single) EACH1
0034740-01-00100Construction Layout LUMP1
0035802-02-00100Permanent Sheeting (Steel) SQFT4,049
0036804-03-01600Steel Piles (18" Pipe) (Cast-in-Place Quantity)LNFT2,408
0037804-17-00100Construction Site Survey LUMP1
0038804-18-00100Vibration Monitoring DAY28
0039805-12-00900Bridge Superstructure and Substructure (16' Clear Roadway, 75 Degree Crossing)SQFT2,400
0040805-18-00100Concrete Finish (Class 2 Rubbed Finish) SQFT1,866
0041805-18-00200Concrete Finish (Class 3 Special Finish) (Cast-in-Place Quantity)SQFT3,088
0042813-01-00100Concrete Approach Slabs (Cast-in-Place) (CAST-IN-PLACE)(10' TAPERED BARRIER RAILING)SQFT360
0043NS-500-00340Saw Cutting Asphalt Concrete Pavement INLF1,214
0044NS-600-00220Saw Cutting Portland Cement Concrete Pavement INLF1,123
0045TS-725-00010Church Lane Detour Road SQYD16,500