Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-02-04501 | Removal of Bridge (STA. 15+20 - 20.2 FT X 39.2 FT TIMBER BRIDGE) | LUMP | 1 |
| 0003 | 203-02-00100 | Drainage Excavation | CUYD | 251 |
| 0004 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0005 | 204-02-00100 | Temporary Hay Bales | EACH | 2 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 4 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | LNFT | 627 |
| 0008 | 302-01-00300 | Class II Base Course (Crushed Stone) | CUYD | 73.5 |
| 0009 | 502-01-00100 | Asphalt Concrete | TON | 58.2 |
| 0010 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 44 |
| 0011 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | LNFT | 30 |
| 0012 | 711-01-03000 | Riprap (30 lb, 14" Thick) | SQYD | 507 |
| 0013 | 711-04-00100 | Geotextile Fabric | SQYD | 507 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0015 | 716-01-00100 | Mulch (Vegetative) | TON | 0.1 |
| 0016 | 717-01-00100 | Seeding | LB | 3 |
| 0017 | 718-01-00100 | Fertilizer | LB | 60 |
| 0018 | 725-02-00100 | Low Profile Runaround | EACH | 1 |
| 0019 | 726-01-00100 | Bedding Material | CUYD | 118.9 |
| 0020 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0021 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 4 |
| 0022 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0023 | 805-15-02300 | Reinforced Concrete Box Culverts (Precast) (10' x 8') | LNFT | 176 |
| 0024 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall HEADWALL | EACH | 2 |
| 0025 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 143 |