Search


Proposal H.012589.6 Item Summary
Scheduled for Letting 11/10/2021  
   
LA 108: LA 1256 - I-10
PILOT PROJECT: This project has been selected as a Density by Non-Destructive Technologies Pilot Project. Special provisions governing requirements can be found in the construction proposal section titled 2021 Density by Non-Destructive Technologies PILOT SPECIAL PROVISION.


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
Line
Number
ItemDescriptionUnitQuantity
0001202-02-06080Removal of Concrete Combination Curb and Gutter LNFT555.7
0002202-02-06102Removal of Incidental Concrete Paving SQYD303
0003202-02-14500Removal of Guard Rail LNFT2,997
0004202-02-26300Removal of Median / Island SQYD25
0005203-01-00100General Excavation CUYD255
0006203-05-00100Excavation and Embankment LUMP1
0007203-07-00100Borrow (Vehicular Measurement) CUYD40
0008204-05-00100Temporary Sediment Check Dams (Hay) EACH24
0009204-06-00100Temporary Silt Fencing LNFT1,974
0010401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) CUYD68
0011502-01-00100Asphalt Concrete TON33,491
0012502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON2,788
0013509-01-00100Milling Asphalt Pavement SQYD176,043
0014509-02-00100Contractor Retained Reclaimed Asphalt Pavement CUYD-6,946
0015510-01-00200Pavement Patching (12" Minimum Thickness) SQYD1,580
0016510-02-00100Pavement Widening 14" THICKSQYD15
0017702-03-00001Catch Basin (Remove and Replace Frame and Cover) EACH11
0018702-04-00001Adjusting Miscellaneous Structures (Replace Drainage Grates) EACH10
0019702-04-00150Adjusting Manholes w/Manhole Adjustment Rings EACH1
0020702-04-00200Adjusting Catch Basins EACH9
0021704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) LNFT1,404
0022704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT1,044
0023704-03-00300Blocked Out Guard Rail – 31”, (3’-1 ½ ” Post Spacing) LNFT218.8
0024704-05-00300Guard Rail Anchor Sections - 31", (Trailing End) LNFT108
0025704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT125
0026704-10-00105Guard Rail End Treatment (Flared, 12' - 6" Length) EACH1
0027704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) EACH4
0028704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) EACH8
0029706-03-00100Incidental Concrete Paving (4" Thick) SQYD1,905
0030706-03-00500Incidental Concrete Paving (8" Thick) SQYD86
0031707-03-00100Combination Concrete Curb and Gutter LNFT520.7
0032713-01-00100Temporary Signs and Barricades LUMP1
0033713-02-00300Temporary Pavement Markings (8" Width) LNFT9,030
0034713-02-00500Temporary Pavement Markings (24" Width) LNFT1,473
0035713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) MILE30.096
0036713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) MILE30.096
0037713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) MILE63.904
0038713-05-00190Temporary Pavement Legends & Symbols (Arrow - Straight) EACH6
0039713-05-00220Temporary Pavement Legends & Symbols (Arrow - Left Turn) EACH138
0040713-05-00230Temporary Pavement Legends & Symbols (Arrow - Right Turn) EACH15
0041713-05-00400Temporary Pavement Legends & Symbols (RR Crossing) EACH36
0042724-02-00100Rumble Strips (Shoulder/Edge) MILE6.989
0043724-03-00100Rumble Strips (Intersection) EACH4
0044727-01-00100Mobilization LUMP1
0045729-16-00200Object Marker Assembly (Type 2) EACH10
0046729-16-00300Object Marker Assembly (Type 3) EACH13
0047731-02-00100Reflectorized Raised Pavement Markers EACH2,951
0048732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) LNFT3,010
0049732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) LNFT491
0050732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE21.302
0051732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) MILE10.032
0052732-03-02010Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) MILE0.205
0053732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) MILE0.372
0054732-04-00001Plastic Pavement Legends and Symbols (Message) I-10EACH1
0055732-04-01020Plastic Pavement Legends and Symbols (Arrow - Straight) EACH2
0056732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) EACH46
0057732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) EACH5
0058732-04-05040Plastic Pavement Legends and Symbols (EXIT ONLY) EACH1
0059732-04-18000Plastic Pavement Legends and Symbols (RR Crossing) EACH12
0060732-05-00100Removal of Existing Markings MILE0.3
0061735-01-00100Mailboxes EACH17
0062735-02-00100Mailbox Supports (Single) EACH13
0063735-03-00100Mailbox Supports (Double) EACH2
0064739-01-00100Hydro-Seeding ACRE0.03
0065740-01-00100Construction Layout LUMP1
0066NS-600-00220Saw Cutting Portland Cement Concrete Pavement INLF2,339.2