Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | LNFT | 555.7 |
| 0002 | 202-02-06102 | Removal of Incidental Concrete Paving | SQYD | 303 |
| 0003 | 202-02-14500 | Removal of Guard Rail | LNFT | 2,997 |
| 0004 | 202-02-26300 | Removal of Median / Island | SQYD | 25 |
| 0005 | 203-01-00100 | General Excavation | CUYD | 255 |
| 0006 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 40 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 24 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,974 |
| 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 68 |
| 0011 | 502-01-00100 | Asphalt Concrete | TON | 33,491 |
| 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 2,788 |
| 0013 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 176,043 |
| 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -6,946 |
| 0015 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 1,580 |
| 0016 | 510-02-00100 | Pavement Widening 14" THICK | SQYD | 15 |
| 0017 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | EACH | 11 |
| 0018 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | EACH | 10 |
| 0019 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | EACH | 1 |
| 0020 | 702-04-00200 | Adjusting Catch Basins | EACH | 9 |
| 0021 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | LNFT | 1,404 |
| 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 1,044 |
| 0023 | 704-03-00300 | Blocked Out Guard Rail – 31”, (3’-1 ½ ” Post Spacing) | LNFT | 218.8 |
| 0024 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | LNFT | 108 |
| 0025 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 125 |
| 0026 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | EACH | 1 |
| 0027 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 4 |
| 0028 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 8 |
| 0029 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | SQYD | 1,905 |
| 0030 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | SQYD | 86 |
| 0031 | 707-03-00100 | Combination Concrete Curb and Gutter | LNFT | 520.7 |
| 0032 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 9,030 |
| 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 1,473 |
| 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 30.096 |
| 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 30.096 |
| 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 63.904 |
| 0038 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | EACH | 6 |
| 0039 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | EACH | 138 |
| 0040 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | EACH | 15 |
| 0041 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | EACH | 36 |
| 0042 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 6.989 |
| 0043 | 724-03-00100 | Rumble Strips (Intersection) | EACH | 4 |
| 0044 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0045 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 10 |
| 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 13 |
| 0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 2,951 |
| 0048 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 3,010 |
| 0049 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 491 |
| 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 21.302 |
| 0051 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 10.032 |
| 0052 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | MILE | 0.205 |
| 0053 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.372 |
| 0054 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) I-10 | EACH | 1 |
| 0055 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | EACH | 2 |
| 0056 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 46 |
| 0057 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 5 |
| 0058 | 732-04-05040 | Plastic Pavement Legends and Symbols (EXIT ONLY) | EACH | 1 |
| 0059 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 12 |
| 0060 | 732-05-00100 | Removal of Existing Markings | MILE | 0.3 |
| 0061 | 735-01-00100 | Mailboxes | EACH | 17 |
| 0062 | 735-02-00100 | Mailbox Supports (Single) | EACH | 13 |
| 0063 | 735-03-00100 | Mailbox Supports (Double) | EACH | 2 |
| 0064 | 739-01-00100 | Hydro-Seeding | ACRE | 0.03 |
| 0065 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0066 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 2,339.2 |