NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
| 0002 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0003 | 204-02-00100 | Temporary Hay Bales (To Be Used at Engineer's Discretion) | EACH | 10 |
| 0004 | 204-06-00100 | Temporary Silt Fencing | LNFT | 4,065 |
| 0005 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 1,435 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0007 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0008 | 739-01-00100 | Hydro-Seeding | ACRE | 2.98 |
| 0009 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0010 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0011 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 478.3 |