Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-38300 | Removal of Sign and U-Channel Post | EACH | 58 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 1,320 |
| 0003 | 204-06-00100 | Temporary Silt Fencing | LNFT | 16,600 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 125 |
| 0005 | 502-01-00100 | Asphalt Concrete | TON | 39,978 |
| 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 12.1 |
| 0007 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 1,302 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -36 |
| 0009 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0010 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 25.072 |
| 0011 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 18.864 |
| 0012 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 44.274 |
| 0013 | 716-01-00100 | Mulch (Vegetative) | TON | 6.8 |
| 0014 | 717-01-00100 | Seeding | LB | 137 |
| 0015 | 718-01-00100 | Fertilizer | LB | 4,559 |
| 0016 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 6.268 |
| 0017 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 12.536 |
| 0018 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0019 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 58 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 831 |
| 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 14.758 |
| 0022 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 6.288 |
| 0023 | 740-01-00100 | Construction Layout | LUMP | 1 |