Search


Proposal H.011825.6 Item Summary
Scheduled for Letting 07/10/2019  
   
BUDDY ELLIS ROAD IMPROVEMENTS


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
Line
Number
ItemDescriptionUnitQuantity
0001201-01-00100Clearing and Grubbing LUMP1
0002202-02-00010Removal of Timber Bridge (STA. 277+31 to STA. 278+11)(25' Wide x 34' Long Timber Bridge)EACH1
0003202-02-02000Removal of Asphalt Drives SQYD160
0004202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS SQYD914
0005202-02-06100Removal of Concrete Walks and Drives SQYD1,052
0006202-02-32100Removal of Pipe (Cross Drain) (15", 24", 30". 36" & 60")LNFT487
0007202-02-32120Removal of Pipe (Side Drain) (8", 12", 18", 24" & 30")LNFT3,480
0008202-02-38240Removal of Signs and Supports EACH36
0009203-02-00100Drainage Excavation CUYD476
0010203-05-00100Excavation and Embankment LUMP1
0011203-10-00100Cleaning Existing Ditches LNFT7,561
0012204-02-00100Temporary Hay Bales EACH119
0013204-06-00100Temporary Silt Fencing LNFT32,271
0014401-01-00100Aggregate Surface Course (Net Section) CUYD822.6
0015402-02-00100Mainline Traffic Maintenance Surfacing (Hard) SQYD320
0016402-03-00100Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) CUYD80
0017502-01-00100Asphalt Concrete TON7,889.9
0018502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous TON913
0019509-01-00100Milling Asphalt Pavement SQYD39,213
0020510-01-00200Pavement Patching (12" Minimum Thickness) SQYD2,429.2
0021510-02-00100Pavement Widening (12" Minimum Thickness)SQYD2,768.8
0022701-02-01000Cross Drain Pipe Arch (24" Equiv. RCPA) LNFT152
0023701-02-01020Cross Drain Pipe Arch (30" Equiv. RCPA) LNFT38
0024701-02-01040Cross Drain Pipe Arch (36" Equiv. RCPA) LNFT236
0025701-02-01060Cross Drain Pipe Arch (42" Equiv. RCPA) LNFT80
0026701-02-01120Cross Drain Pipe Arch (60" Equiv. RCPA) LNFT120
0027701-02-01140Cross Drain Pipe Arch (72" Equiv. RCPA) LNFT92
0028701-03-01022Storm Drain Pipe (18" RCP/RPVCP) LNFT570
0029701-03-01042Storm Drain Pipe (24" RCP/RPVCP) LNFT384
0030701-03-01062Storm Drain Pipe (30" RCP/RPVCP) LNFT148
0031701-03-01082Storm Drain Pipe (36" RCP/RPVCP) LNFT480
0032701-03-01092Storm Drain Pipe (42" RCP/RPVCP) LNFT132
0033701-03-01102Storm Drain Pipe (48" RCP/RPVCP) LNFT128
0034701-03-02022Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) LNFT170
0035701-03-02042Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) LNFT312
0036701-03-02122Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) LNFT70
0037701-05-01043Side Drain Pipe (18" RCP/RPVCP/CMP) LNFT148
0038701-05-01062Side Drain Pipe (24" RCP/RPVCP/CMP) LNFT28
0039701-05-02062Side Drain Pipe (Erosion) (24" RPVCP/CMP) LNFT370
0040701-06-01020Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) LNFT2,298
0041701-06-01040Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) LNFT502
0042701-06-01060Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) LNFT32
0043701-17-00100Trench Excavation Safety Protection (Depth >5 feet) LNFT380
0044702-03-00100Catch Basins (CB-01) EACH13
0045702-03-00200Catch Basins (CB-02) EACH4
0046704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT81.3
0047704-05-00300Guard Rail Anchor Sections - 31", (Trailing End) LNFT9.9
0048704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT168.8
0049704-10-00105Guard Rail End Treatment (Flared, 12' - 6" Length) EACH1
0050704-10-00110Guard Rail End Treatment (Flared 18' - 9" Length) EACH1
0051704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) EACH6
0052706-01-00100Concrete Walk (4" Thick) SQYD3.9
0053706-02-00200Concrete Drive (6" Thick) SQYD927.5
0054710-01-00100Flowable Fill CUYD6
0055711-01-04000Riprap (55 lb, 18" Thick) SQYD607
0056711-04-00100Geotextile Fabric SQYD607
0057713-01-00100Temporary Signs and Barricades LUMP1
0058713-03-01020Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) MILE6.661
0059720-01-01000Erosion Control System (Slope Protection) (Type A) SQYD5,226
0060720-01-02020Erosion Control System, Flexible (Channel Liner) (Type D) SQYD154
0061726-01-00100Bedding Material CUYD863.9
0062727-01-00100Mobilization LUMP1
0063729-01-00100Sign (Type A) SQFT272.3
0064729-02-00100Sign (Type B) SQFT24.3
0065729-08-00100Mounting (2 1/2" Size Post) EACH1
0066729-16-00300Object Marker Assembly (Type 3) EACH28
0067729-22-00200Square Tubing Post with 2-1/4" Omni-Directional Anchor EACH52
0068731-02-00100Reflectorized Raised Pavement Markers EACH886
0069732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) LNFT157
0070732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE6.712
0071735-01-00100Mailboxes EACH114
0072735-02-00100Mailbox Supports (Single) EACH114
0073739-01-00100Hydro-Seeding ACRE8.14
0074740-01-00100Construction Layout LUMP1
0075802-02-00100Permanent Sheeting (Steel) SQFT3,520
0076804-01-00300Precast Concrete Piles (16") LNFT800
0077804-17-00100Construction Site Survey LUMP1
0078804-18-00100Vibration Monitoring (Including Initial Site Survey)DAY10
0079805-12-00500Bridge Superstructure and Substructure (28' Roadway, 90 Degree Crossing) SQFT1,680
0080805-18-00100Concrete Finish (Class 2 Rubbed Finish) SQFT717
0081805-18-00200Concrete Finish (Class 3 Special Finish) SQFT717
0082813-01-00100Concrete Approach Slabs (Cast-in-Place) (28' Clear Roadway, 90 Deg. Crossing, w/Asphalt)SQFT580
0083NS-300-00060Geogrid SQYD81