Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-02-00010 | Removal of Timber Bridge (STA. 277+31 to STA. 278+11)(25' Wide x 34' Long Timber Bridge) | EACH | 1 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 160 |
| 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 914 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 1,052 |
| 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (15", 24", 30". 36" & 60") | LNFT | 487 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (8", 12", 18", 24" & 30") | LNFT | 3,480 |
| 0008 | 202-02-38240 | Removal of Signs and Supports | EACH | 36 |
| 0009 | 203-02-00100 | Drainage Excavation | CUYD | 476 |
| 0010 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0011 | 203-10-00100 | Cleaning Existing Ditches | LNFT | 7,561 |
| 0012 | 204-02-00100 | Temporary Hay Bales | EACH | 119 |
| 0013 | 204-06-00100 | Temporary Silt Fencing | LNFT | 32,271 |
| 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | CUYD | 822.6 |
| 0015 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | SQYD | 320 |
| 0016 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 80 |
| 0017 | 502-01-00100 | Asphalt Concrete | TON | 7,889.9 |
| 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 913 |
| 0019 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 39,213 |
| 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | SQYD | 2,429.2 |
| 0021 | 510-02-00100 | Pavement Widening (12" Minimum Thickness) | SQYD | 2,768.8 |
| 0022 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | LNFT | 152 |
| 0023 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | LNFT | 38 |
| 0024 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | LNFT | 236 |
| 0025 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | LNFT | 80 |
| 0026 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | LNFT | 120 |
| 0027 | 701-02-01140 | Cross Drain Pipe Arch (72" Equiv. RCPA) | LNFT | 92 |
| 0028 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | LNFT | 570 |
| 0029 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | LNFT | 384 |
| 0030 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | LNFT | 148 |
| 0031 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | LNFT | 480 |
| 0032 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | LNFT | 132 |
| 0033 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | LNFT | 128 |
| 0034 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | LNFT | 170 |
| 0035 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | LNFT | 312 |
| 0036 | 701-03-02122 | Storm Drain Pipe (Outfall) (48" RPVCP or 54" CMP) | LNFT | 70 |
| 0037 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | LNFT | 148 |
| 0038 | 701-05-01062 | Side Drain Pipe (24" RCP/RPVCP/CMP) | LNFT | 28 |
| 0039 | 701-05-02062 | Side Drain Pipe (Erosion) (24" RPVCP/CMP) | LNFT | 370 |
| 0040 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | LNFT | 2,298 |
| 0041 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | LNFT | 502 |
| 0042 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | LNFT | 32 |
| 0043 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 380 |
| 0044 | 702-03-00100 | Catch Basins (CB-01) | EACH | 13 |
| 0045 | 702-03-00200 | Catch Basins (CB-02) | EACH | 4 |
| 0046 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 81.3 |
| 0047 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | LNFT | 9.9 |
| 0048 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 168.8 |
| 0049 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | EACH | 1 |
| 0050 | 704-10-00110 | Guard Rail End Treatment (Flared 18' - 9" Length) | EACH | 1 |
| 0051 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 6 |
| 0052 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 3.9 |
| 0053 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 927.5 |
| 0054 | 710-01-00100 | Flowable Fill | CUYD | 6 |
| 0055 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 607 |
| 0056 | 711-04-00100 | Geotextile Fabric | SQYD | 607 |
| 0057 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0058 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | MILE | 6.661 |
| 0059 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | SQYD | 5,226 |
| 0060 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | SQYD | 154 |
| 0061 | 726-01-00100 | Bedding Material | CUYD | 863.9 |
| 0062 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0063 | 729-01-00100 | Sign (Type A) | SQFT | 272.3 |
| 0064 | 729-02-00100 | Sign (Type B) | SQFT | 24.3 |
| 0065 | 729-08-00100 | Mounting (2 1/2" Size Post) | EACH | 1 |
| 0066 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 28 |
| 0067 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | EACH | 52 |
| 0068 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 886 |
| 0069 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 157 |
| 0070 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 6.712 |
| 0071 | 735-01-00100 | Mailboxes | EACH | 114 |
| 0072 | 735-02-00100 | Mailbox Supports (Single) | EACH | 114 |
| 0073 | 739-01-00100 | Hydro-Seeding | ACRE | 8.14 |
| 0074 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0075 | 802-02-00100 | Permanent Sheeting (Steel) | SQFT | 3,520 |
| 0076 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 800 |
| 0077 | 804-17-00100 | Construction Site Survey | LUMP | 1 |
| 0078 | 804-18-00100 | Vibration Monitoring (Including Initial Site Survey) | DAY | 10 |
| 0079 | 805-12-00500 | Bridge Superstructure and Substructure (28' Roadway, 90 Degree Crossing) | SQFT | 1,680 |
| 0080 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 717 |
| 0081 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 717 |
| 0082 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) (28' Clear Roadway, 90 Deg. Crossing, w/Asphalt) | SQFT | 580 |
| 0083 | NS-300-00060 | Geogrid | SQYD | 81 |