Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 5,586.7 |
| 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | SQYD | 5,586.7 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 125 |
| 0004 | 302-02-08500 | Class II Base Course (8-1/2" Thick) | SQYD | 6,127.5 |
| 0005 | 304-01-00100 | Lime | TON | 135.11 |
| 0006 | 304-05-00100 | Lime Treatment (Type E) | SQYD | 6,127 |
| 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 120 |
| 0008 | 502-01-00100 | Asphalt Concrete | TON | 1,097.1 |
| 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 29.4 |
| 0010 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 1.07 |
| 0012 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 2.14 |
| 0013 | 716-01-00100 | Mulch (Vegetative) | TON | 0.7 |
| 0014 | 717-01-00100 | Seeding | LB | 21 |
| 0015 | 718-01-00100 | Fertilizer | LB | 336 |
| 0016 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 141 |
| 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 2.14 |
| 0019 | 740-01-00100 | Construction Layout | LUMP | 1 |