Line Number | Item | Description | Unit | Quantity |
| 0001 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 10 |
| 0002 | 502-01-00100 | Asphalt Concrete | TON | 1,713.7 |
| 0003 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 156 |
| 0004 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 5,012 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -232 |
| 0006 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | SQYD | 13 |
| 0007 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0008 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 192 |
| 0009 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 148 |
| 0010 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 1.324 |
| 0011 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 0.552 |
| 0012 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 3.84 |
| 0013 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | EACH | 2 |
| 0014 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 0.5 |
| 0015 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 1 |
| 0016 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0017 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 6 |
| 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 322 |
| 0019 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 96 |
| 0020 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 95 |
| 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 3.368 |
| 0022 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.552 |
| 0023 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | MILE | 0.034 |
| 0024 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.043 |
| 0025 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 1 |
| 0026 | 735-01-00100 | Mailboxes | EACH | 6 |
| 0027 | 735-02-00100 | Mailbox Supports (Single) | EACH | 4 |
| 0028 | 735-03-00100 | Mailbox Supports (Double) | EACH | 1 |
| 0029 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0030 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course | TON | 494 |