Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-14500 | Removal of Guard Rail | LNFT | 393 |
| 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" RCP, 60" CMPA, 72" CMPA | LNFT | 127 |
| 0003 | 202-02-32180 | Removal of Pipe Headwalls | EACH | 4 |
| 0004 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 74 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 22 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | LNFT | 5,710 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 52 |
| 0009 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 532.7 |
| 0010 | 502-01-00100 | Asphalt Concrete | TON | 15,054.9 |
| 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 1,320.9 |
| 0012 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 7,418 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -286 |
| 0014 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | SQYD | 283 |
| 0015 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | SQYD | 2,852 |
| 0016 | 701-01-01001 | Cross Drain Pipe (24" RCP) | LNFT | 48 |
| 0017 | 701-02-01140 | Cross Drain Pipe Arch (72" Equiv. RCPA) | LNFT | 88 |
| 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 162.5 |
| 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
| 0020 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 4 |
| 0021 | 710-01-00100 | Flowable Fill | CUYD | 403 |
| 0022 | 712-02-00100 | Sacked Concrete Revetment | SQYD | 338 |
| 0023 | 712-04-00100 | Flexible Revetment | SQYD | 175 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 7.967 |
| 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 7.633 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 17.959 |
| 0028 | 724-01-00100 | Rumble Strips (Centerline) | MILE | 7.7 |
| 0029 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 15.4 |
| 0030 | 726-01-00100 | Bedding Material | CUYD | 51.2 |
| 0031 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 6 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,086 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 17.959 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 7.633 |
| 0037 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | MILE | 0.2 |
| 0038 | 735-01-00100 | Mailboxes | EACH | 161 |
| 0039 | 735-02-00100 | Mailbox Supports (Single) | EACH | 129 |
| 0040 | 735-03-00100 | Mailbox Supports (Double) | EACH | 16 |
| 0041 | 739-01-00100 | Hydro-Seeding | ACRE | 0.97 |
| 0042 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0043 | NS-300-00060 | Geogrid | SQYD | 72 |