Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 314 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 193.8 |
| 0003 | 202-02-06060 | Removal of Concrete Catch Basin | EACH | 2 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 434 |
| 0005 | 202-02-14500 | Removal of Guard Rail | LNFT | 77 |
| 0006 | 202-02-26000 | Removal of Manholes | EACH | 1 |
| 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" DIAMETER PIPE AND SMALLER | LNFT | 131 |
| 0008 | 202-02-38200 | Removal of Signs | EACH | 60 |
| 0009 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 325 |
| 0011 | 203-10-00100 | Cleaning Existing Ditches | LNFT | 9,243 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | LNFT | 2,000 |
| 0013 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 100 |
| 0014 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | SQYD | 45 |
| 0015 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | CUYD | 175 |
| 0016 | 502-01-00100 | Asphalt Concrete | TON | 9,139.5 |
| 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 455.5 |
| 0018 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 84,592 |
| 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -2,349 |
| 0020 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | SQYD | 2,779 |
| 0021 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | LNFT | 70 |
| 0022 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | LNFT | 459 |
| 0023 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | LNFT | 269 |
| 0024 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | LNFT | 79 |
| 0025 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | LNFT | 112 |
| 0026 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | LNFT | 1,301 |
| 0027 | 701-08-00100 | Relaying Pipe | LNFT | 10 |
| 0028 | 701-14-00100 | Cleaning Existing Pipes | LNFT | 2,086 |
| 0029 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | LNFT | 2,857 |
| 0030 | 702-02-00200 | Manholes (R-CB-11) | EACH | 1 |
| 0031 | 702-03-00100 | Catch Basins (CB-01) | EACH | 28 |
| 0032 | 702-03-00200 | Catch Basins (CB-02) | EACH | 8 |
| 0033 | 702-03-00300 | Catch Basins (CB-04) | EACH | 2 |
| 0034 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 12.5 |
| 0035 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 25 |
| 0036 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 1 |
| 0037 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 433.8 |
| 0038 | 706-04-00100 | Handicapped Curb Ramps TYPE 4 | EACH | 2 |
| 0039 | 707-01-00200 | Concrete Curb (Barrier) | LNFT | 13.5 |
| 0040 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | SQYD | 307 |
| 0041 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0042 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 550 |
| 0043 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 747 |
| 0044 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 6.358 |
| 0045 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 30.614 |
| 0046 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | EACH | 8 |
| 0047 | 717-01-00100 | Seeding | LB | 71 |
| 0048 | 718-01-00100 | Fertilizer | LB | 907 |
| 0049 | 726-01-00100 | Bedding Material | CUYD | 587.8 |
| 0050 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0051 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 1 |
| 0052 | 729-19-00300 | Dead End Road Installations (Type C) | EACH | 12 |
| 0053 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 725 |
| 0054 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | LNFT | 105 |
| 0055 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | LNFT | 254 |
| 0056 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | LNFT | 120 |
| 0057 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 15.307 |
| 0058 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 3.179 |
| 0059 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | MILE | 0.03 |
| 0060 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 4 |
| 0061 | 735-01-00100 | Mailboxes | EACH | 1 |
| 0062 | 735-02-00100 | Mailbox Supports (Single) | EACH | 1 |
| 0063 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0064 | NS-203-00006 | Exploratory Excavation | CUYD | 150 |
| 0065 | NS-203-00007 | Temporary Sheeting and Bracing | LUMP | 1 |
| 0066 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | LNFT | 44,120 |
| 0067 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | LNFT | 24,300 |
| 0068 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | LNFT | 68,420 |
| 0069 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 3,734 |
| 0070 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | INLF | 3,400 |
| 0071 | NS-602-00001 | Milling Concrete Pavement | SQYD | 789 |
| 0112 | 202-02-38300 | Removal of Sign and U-Channel Post | EACH | 48 |
| 0113 | 729-01-00102 | Sign (Type A)(Furnish and Install) | SQFT | 513.5 |
| 0114 | 729-21-00100 | U-Channel Post | EACH | 52 |