SNEED ROAD BRIDGE OVER TORO CREEK


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
Line
Number
ItemDescriptionUnitQuantity
0001201-01-00100Clearing and Grubbing LUMP1
0002202-01-00100Removal of Structures and Obstructions LUMP1
0003202-02-00010Removal of Tank Car (Sta. 15+16, 9.33' Diameter, 0.50" Wall Thickness, 44.7' Long)EACH1
0004203-05-00100Excavation and Embankment LUMP1
0005204-02-00100Temporary Hay Bales EACH9
0006204-03-00100Temporary Slope Drains LNFT80
0007204-05-00100Temporary Sediment Check Dams (Hay) EACH4
0008204-06-00100Temporary Silt Fencing LNFT919
0009401-01-00100Aggregate Surface Course (Net Section) CUYD86.1
0010701-05-02061Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) (Erosion)LNFT100
0011704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) LNFT50
0012704-07-00200Guard Rail Transitions (Double Thrie Beam) LNFT100
0013704-10-00100Guard Rail End Treatment (Flared) EACH4
0014711-01-04000Riprap (55 lb, 18" Thick) SQYD400
0015711-04-00100Geotextile Fabric SQYD400
0016713-01-00100Temporary Signs and Barricades LUMP1
0017716-01-00100Mulch (Vegetative) TON0.5
0018717-01-00100Seeding LB12
0019718-01-00100Fertilizer LB230
0020727-01-00100Mobilization LUMP1
0021729-16-00300Object Marker Assembly (Type 3) EACH4
0022740-01-00100Construction Layout LUMP1
0023804-01-00300Precast Concrete Piles (16") LNFT1,040
0024805-12-00100Bridge Superstructure and Substructure (24' Roadway, 90 Degree Crossing) (Cast In Place Only)SQFT1,440
0025805-18-00100Concrete Finish (Class 2 Rubbed Finish) SQFT722.84
0026805-18-00200Concrete Finish (Class 3 Special Finish) SQFT722.84
0027813-01-00100Concrete Approach Slabs (Cast-in-Place) SQFT500