Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | LUMP | 1 |
| 0003 | 202-02-00010 | Removal of Tank Car (Sta. 15+16, 9.33' Diameter, 0.50" Wall Thickness, 44.7' Long) | EACH | 1 |
| 0004 | 203-05-00100 | Excavation and Embankment | LUMP | 1 |
| 0005 | 204-02-00100 | Temporary Hay Bales | EACH | 9 |
| 0006 | 204-03-00100 | Temporary Slope Drains | LNFT | 80 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | EACH | 4 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | LNFT | 919 |
| 0009 | 401-01-00100 | Aggregate Surface Course (Net Section) | CUYD | 86.1 |
| 0010 | 701-05-02061 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CMP) (Erosion) | LNFT | 100 |
| 0011 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | LNFT | 50 |
| 0012 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 100 |
| 0013 | 704-10-00100 | Guard Rail End Treatment (Flared) | EACH | 4 |
| 0014 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 400 |
| 0015 | 711-04-00100 | Geotextile Fabric | SQYD | 400 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0017 | 716-01-00100 | Mulch (Vegetative) | TON | 0.5 |
| 0018 | 717-01-00100 | Seeding | LB | 12 |
| 0019 | 718-01-00100 | Fertilizer | LB | 230 |
| 0020 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0021 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 4 |
| 0022 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0023 | 804-01-00300 | Precast Concrete Piles (16") | LNFT | 1,040 |
| 0024 | 805-12-00100 | Bridge Superstructure and Substructure (24' Roadway, 90 Degree Crossing) (Cast In Place Only) | SQFT | 1,440 |
| 0025 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | SQFT | 722.84 |
| 0026 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | SQFT | 722.84 |
| 0027 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | SQFT | 500 |