Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-02000 | Removal of Asphalt Drives | SQYD | 214 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | SQYD | 1,716.7 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | SQYD | 463 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | LNFT | 1,549 |
| 0005 | 202-02-14500 | Removal of Guard Rail | LNFT | 13,383.6 |
| 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 580+34, 582+96, 585+63, 586+66 | LNFT | 376 |
| 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | SQYD | 2,177 |
| 0008 | 203-01-00100 | General Excavation | CUYD | 374 |
| 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 1,286 |
| 0010 | 203-10-00100 | Cleaning Existing Ditches | LNFT | 465 |
| 0011 | 501-01-00100 | Thin Asphalt Concrete (Dense Mix) | TON | 2,003 |
| 0012 | 502-01-00100 | Asphalt Concrete | TON | 283.3 |
| 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 1,248.7 |
| 0014 | 502-03-00600 | Asphalt Concrete (12" Thick) | SQYD | 888 |
| 0015 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course | TON | 15,151.6 |
| 0016 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 171,412 |
| 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -4,278 |
| 0018 | 510-03-00100 | Pavement Joint Repair | TON | 77.3 |
| 0019 | 510-04-00100 | Pavement Patching | TON | 1,372.5 |
| 0020 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | LNFT | 31,222 |
| 0021 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | SQYD | 453.7 |
| 0022 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | SQYD | 272.8 |
| 0023 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | SQYD | 354.2 |
| 0024 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | LNFT | 376 |
| 0025 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | LNFT | 1,187.6 |
| 0026 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | LNFT | 9,944.6 |
| 0027 | 704-04-00200 | Blocked Out Guard Rail – 31”, (Double Faced, 6’-3” Post Spacing) | LNFT | 412.5 |
| 0028 | 704-05-00300 | Guard Rail Anchor Sections – 31”, (Trailing End) | LNFT | 227.7 |
| 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | LNFT | 500 |
| 0030 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | EACH | 30 |
| 0031 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | EACH | 4 |
| 0032 | 706-01-00100 | Concrete Walk (4" Thick) | SQYD | 332 |
| 0033 | 706-02-00200 | Concrete Drive (6" Thick) | SQYD | 79.7 |
| 0034 | 706-04-00100 | Handicapped Curb Ramps | EACH | 18 |
| 0035 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0036 | 713-02-00300 | Temporary Pavement Markings (8" Width) | LNFT | 9,177 |
| 0037 | 713-02-00500 | Temporary Pavement Markings (24" Width) | LNFT | 1,526 |
| 0038 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 8.041 |
| 0039 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 22.557 |
| 0040 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | EACH | 29 |
| 0041 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | EACH | 29 |
| 0042 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | EACH | 2 |
| 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 7.7 |
| 0044 | 726-01-00100 | Bedding Material | CUYD | 71.8 |
| 0045 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 52 |
| 0047 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | EACH | 2,412 |
| 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 2,003 |
| 0049 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | LNFT | 1,526 |
| 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 22.557 |
| 0051 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | MILE | 1.738 |
| 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 8.041 |
| 0053 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | MILE | 0.62 |
| 0054 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | EACH | 18 |
| 0055 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | EACH | 11 |
| 0056 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | EACH | 29 |
| 0057 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | EACH | 2 |
| 0058 | 732-05-00100 | Removal of Existing Markings | MILE | 2.431 |
| 0059 | 739-01-00100 | Hydro-Seeding | ACRE | 1.4 |
| 0060 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0061 | 822-15-02100 | Relocate Light Poles 564+75, 575+78 | EACH | 2 |
| 0062 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | LNFT | 111,271 |
| 0063 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | LNFT | 79,629 |
| 0064 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | LNFT | 190,900 |
| 0065 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | INLF | 3,540 |
| 0066 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | INLF | 17,134 |
| 0067 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | INLF | 7,580 |
| 0068 | NS-602-00010 | Cleaning and Sealing Vertical Concrete Joints | LNFT | 783 |
| 0069 | NS-702-00001 | Cleaning Existing Catch Basin | EACH | 25 |
| 0070 | NS-713-00009 | Portable Changeable Message Sign (with communications) | EACH | 2 |
| 0071 | NS-MSC-00120 | Drainage Structure 568+85, 569+65, 570+09, 570+50, 570+62, 570+99, 571+76 | EACH | 7 |