Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-02-14500 | Removal of Guard Rail | LNFT | 11,602 |
| 0003 | 202-02-38300 | Removal of Sign and U-Channel Post | EACH | 10 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 567 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | LNFT | 1,000 |
| 0006 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | TON | 5,178.2 |
| 0007 | 502-01-00100 | Asphalt Concrete | TON | 14,779.7 |
| 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 807.3 |
| 0009 | 509-01-00100 | Milling Asphalt Pavement | SQYD | 133,861 |
| 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -3,718 |
| 0012 | 701-15-00100 | Concrete Collar | EACH | 13 |
| 0013 | 704-01-01020 | Guardrail (Single Thrie Beam) (6'-3" post spacing) | LNFT | 9,120 |
| 0015 | 704-06-00200 | Guardrail Bridge Attachments (Single Thrie Beam) | LNFT | 93.7 |
| 0016 | 704-07-00200 | Guardrail Transitions (Double Thrie Beam) | LNFT | 225 |
| 0018 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | SQYD | 195 |
| 0019 | 707-01-00100 | Concrete Curb | LNFT | 121.5 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 21.48 |
| 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 21.48 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 42.96 |
| 0024 | 717-01-00100 | Seeding | LB | 15 |
| 0025 | 718-01-00100 | Fertilizer | LB | 500 |
| 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | MILE | 14.32 |
| 0027 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0028 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 26 |
| 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | EACH | 10 |
| 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 1,890 |
| 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 14.32 |
| 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 7.16 |
| 0033 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0034 | NS-713-00009 | Portable Changeable Message Sign (with communications) | EACH | 8 |
| 0035 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | LNFT | 1,800 |
| 0036 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | EACH | 9 |
| 0037 | NS-509-00001 | Micro-Milling Asphaltic Pavement | SQYD | 100 |