Line Number | Item | Description | Unit | Quantity |
| 0001 | 201-01-00100 | Clearing and Grubbing | LUMP | 1 |
| 0002 | 202-02-04510 | Removal of Bridge Deck (Hydro Demolition) Partial Deck Removal for Pile Driving | SFIN | 972 |
| 0003 | 202-02-04570 | Removal of Bridge Pile Removal of existing piles | EACH | 42 |
| 0004 | 202-02-06090 | Removal of Concrete Revetment | LUMP | 1 |
| 0005 | 203-03-00100 | Embankment | CUYD | 150 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | LNFT | 750 |
| 0007 | 711-01-04000 | Riprap (55 lb, 18" Thick) | SQYD | 4,113 |
| 0008 | 711-04-00100 | Geotextile Fabric | SQYD | 4,113 |
| 0009 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0010 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | MILE | 0.795 |
| 0011 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | EACH | 25 |
| 0012 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | EACH | 25 |
| 0013 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0014 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 60 |
| 0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 0.795 |
| 0016 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0017 | 804-03-01800 | Steel Piles (24" Pipe) | LNFT | 3,424 |
| 0018 | 804-14-00100 | Dynamic Monitoring Assistance | EACH | 4 |
| 0019 | 806-01-00100 | Deformed Reinforcing Steel | LB | 589 |
| 0020 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice Stainless Steel | EACH | 128 |
| 0021 | 807-01-00200 | Structural Metalwork (Grade 50) | LUMP | 1 |
| 0022 | 830-07-00100 | Structural Concrete Patching | SQFT | 72 |
| 0023 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | EACH | 1 |
| 0024 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | EACH | 1 |
| 0025 | NS-713-00009 | Portable Changeable Message Sign (with communications) | EACH | 4 |