Search


Proposal H.012848.6 Item Summary
Scheduled for Letting 06/14/2017  
   
US 61: ST JAMES P/L - 2450' S OF LA 22
ASPHALT PILOT PROJECT: This project has been selected as an Asphalt Pilot Project. Special provisions governing asphalt requirements can be found in the construction proposal section titled 2015 ASPHALT PILOT SPECIAL PROVISION.


NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
Line
Number
ItemDescriptionUnitQuantity
0001203-07-00100Borrow (Vehicular Measurement) CUYD1,259.26
0002204-05-00100Temporary Sediment Check Dams (Hay) EACH20
0003204-06-00100Temporary Silt Fencing LNFT2,000
0004713-01-00100Temporary Signs and Barricades LUMP1
0005713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) MILE20
0006727-01-00100Mobilization LUMP1
0007731-02-00100Reflectorized Raised Pavement Markers EACH1,324
0008732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) LNFT1,866
0009732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) LNFT497
0010732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) MILE20.5
0011732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) MILE10
0012732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) EACH2
0013732-04-15020Plastic Pavement Legends and Symbols (ONLY) EACH2
0014739-01-00100Hydro-Seeding ACRE11.74
0015740-01-00100Construction Layout LUMP1
0016NS-500-00340Saw Cutting Asphaltic Concrete Pavement INLF290,694
0017NS-502-01000Asphalt Concrete TON10,283.8
0018NS-509-01000Milling Asphalt Pavement SQYD68,000
0019NS-509-02000Contractor Retained Reclaimed Asphalt Pavement CUYD-3,637
0020NS-713-00009Portable Changeable Message Sign (with communications) EACH2
0021NS-724-00005Rumble Strips (Shoulder) MILE19.318
0022NS-DEV-30801In-Place Slag Stabilized Blended BCS Base Course 8 in Thick SQYD38,529