Line Number | Item | Description | Unit | Quantity |
| 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) (2) 18" CMP | LNFT | 56 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | CUYD | 725 |
| 0003 | 204-06-00100 | Temporary Silt Fencing | LNFT | 19,500 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | CUYD | 483 |
| 0005 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | LNFT | 56 |
| 0006 | 701-14-00100 | Cleaning Existing Pipes | LNFT | 311 |
| 0007 | 713-01-00100 | Temporary Signs and Barricades | LUMP | 1 |
| 0008 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | MILE | 3.606 |
| 0009 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | MILE | 5.802 |
| 0010 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | MILE | 20.668 |
| 0011 | 717-01-00100 | Seeding | LB | 162 |
| 0012 | 718-01-00100 | Fertilizer | LB | 5,392 |
| 0013 | 726-01-00100 | Bedding Material 12" thick | CUYD | 20 |
| 0014 | 727-01-00100 | Mobilization | LUMP | 1 |
| 0015 | 729-16-00200 | Object Marker Assembly (Type 2) | EACH | 24 |
| 0016 | 731-02-00100 | Reflectorized Raised Pavement Markers | EACH | 489 |
| 0017 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | MILE | 10.334 |
| 0018 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | MILE | 5.802 |
| 0019 | 735-01-00100 | Mailboxes | EACH | 136 |
| 0020 | 735-02-00100 | Mailbox Supports (Single) | EACH | 111 |
| 0021 | 735-03-00100 | Mailbox Supports (Double) | EACH | 6 |
| 0022 | 735-04-00100 | Mailbox Supports (Multiple) | EACH | 4 |
| 0023 | 740-01-00100 | Construction Layout | LUMP | 1 |
| 0024 | NS-200-00020 | Cleaning Existing Ditches | LNFT | 19,500 |
| 0025 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | INLF | 640 |
| 0026 | NS-502-01000 | Asphalt Concrete | TON | 5,041.4 |
| 0027 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | TON | 196.2 |
| 0028 | NS-509-01000 | Milling Asphalt Pavement | SQYD | 44,976 |
| 0029 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | CUYD | -1,812 |
| 0030 | NS-510-01700 | Pavement Patching (18" Minimum Thickness) | SQYD | 2,887 |
| 0031 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | LNFT | 56 |